Projects

List of On Going Projects

Sl. No. Project Name Client Associate Consultant

Project Cost

(mil USD)

Project

Period

Funding Agency Exec. Agency
A. ROAD, BRIDGE, CULVERT AND RURAL INFRASTRUCTURE DEVELOPMENT
1. Feasibility Study of Proposed Dhour-Kadda-Salna Road (Approx. length is 18.800 km) under RHD, Dhaka Road Circle, Dhaka. RHD

RHD

JV: EPC-Cheil, Korea. 0.084

Sep’23-

Jan’24

2. Consultancy Services for Design and Supervision of Bangabandhu Sheikh Mujib Shilpa Nagar (BSMSN) Development Project (Package No.: PMC15-BSMSN-BEZA BEZA

WB

JV: CHEIL, Korea (Lead)-Yooshin, Korea-EPC 502.858

July’23-

June’28

3. Consultancy Services for Drainage Design Works of Dhaka Ashulia Elevated  Expressway Project. BBA

PPP
CMC-
TDD(Chain)

North China Municipal Engineers Design & Reearch Institute Co.Ltd.(NCME 1586.98 Jan’23-Jun’23
 4. Consultancy Services for Feasibility Study with Improvement of Different Intersections including Traffic Signal in Dhaka South City Corporation Area DSCC GoB JV: EPC-BISR Sep’22-Feb’24
5. Consultancy Service for Construction Supervision of Sayedpur Bridge, Detailed Design of Hasnabad intersection, Detail Design & Estimate of 4-lane Bridge at Postagola and Preliminary Design of Buriganga Bridge at Fatulla, Narayanganj RHD GoB DECL-EPC-Devcon Jun’22-Oct’23
6.         Design and Supervision Consultancy Services for Construction of 1490m Kadamrasul bridge over the river Shitalakhya near 5no Gudaraghat of Narayanganj City Corporation (NCCKB) Project-Cable Stayed Bridge LGED LGED/ NCC Dongsung, Korea(Lead)-DM, Korea-EPC-S&F 150.00

Jan’20-

Jan’23

7.         Consultancy Services for Design and Construction Supervision of 1470m long Paira Bridge (Lebukhali Bridge) over the River Paira on Barisal Patuakhali Road, Bangladesh (KFAED Loan No. 841)- Extradosed Bridge KFAED RHD ICT-KUNHWA-NARCO 182.04 Jan.’14-Jun.’21
B. ARCHITECTURAL & CIVIL ENGINEERING PROJECTS
8.         Consultancy Services for Construction Supervision of 16-Storied Residential Building Project, located at House # SW(3)-7, Road #7, Gulshan-1, Dhaka. Private Private 28.31 May 2017May 2021

List of Completed Projects

  1. WATER RESOURCES DEVELOPMENT PROJECTS
Sl. No. Project Name Client Associate Consultant

Project Cost

(mil USD)

Project

Period

Funding Agency Exec. Agency
1. Consultancy Services for Feasibility Study of Capital Dredging and Sustainable River Management in Bangladesh GoB BWDB CES, Demas, DHI, BETS & Devcon 135.28 Sep’11-Jun’15
2. Consultancy Services for Environmental & Social Impact Assessment Study for the Pilot Project under Capacity Development of Management for Sustainable Water Related Infrastructure of Bangladesh under JICA/BWDB. JICA BWDB/ IDEA Consultants Inc. 2.00 billion Jun.’14-Aug. ‘15
3. Consultancy Services for the “Development Phase of Rehabilitation Water Management Infrastructure in Bhola District (DWMIB)”, funded by NLEVD International (ORIO 11/BD/21) on behalf of the Government of Netherlands. NLEVD Intern-ational (ORIO) BWDB Royal Haskoning  DHV Netherland BV and AGT Group BV (the Netherlands), Tech Force Innovations BV (the Netherlands) IWM, Tiger IT. € (million): 50.00 Aug’13-Feb’15
4. Consultancy Services for Improved Water Management in BWDB Schemes (Contract Package No. BWDB/S-1) under Water Management Improvement Project (IDA Credit No. 4359-BD) IDA BWDB SNC-Lavalin Int. Inc. of Canada, AQUA & DevCon of Bangladesh. 143.50 Jan’10-June’15
5. Feasibility Study for Integrated Water Management Project of Gungiajuri Haor Area (Main Consultant) BWDB BWDB BETS & DPM Tk. 186.00 lacs June’10-June’11
6. Consultancy Services for Estuary Development Programme (EDP) under Dutch Assistance. Dutch BWDB DHV b.V., Haskoning b.v., DEVCON, Kranti, BETS. 8.60 Mar’07-Nov’10
7. District Water Resources Assessment (DWRA) under Small Scale Water Resources Development Sector Project-2, ADB Loan No. 1831-BAN (SF) – 2nd assignment. ADB LGED Tk. 42,734.00 lacs. Jul’07-Jun’09
8. Feasibility Studies for Integrated Water Resources Management of Chalan Beel Area including Beel Halti Development Project BWDB BWDB BETS, Kranti, DPM 54.06 Mar’06-Aug’07
9. Emergency Flood Damage Rehabilitation Project – Design and Construction Supervision Consultants (Part D: Water Resources) ADB BWDB DHV, RPMC, DPM, DEVCON Tk. 7310.14 Lacs Jan’05-Aug’07
10. District Water Resources Assessment (DWRA) under Small Scale Water Resources Development Sector Project-2, ADB Loan No. 1831-BAN (SF) – 1st assignment. ADB LGED Tk. 42,734.00 lacs. Apr’04- Jun’07
11. Southwest Area Integrated Water Resources Management Project, BWDB ADB TA 4079 BAN: Project Identification and Feasibility Studies ADB BWDB Halcrow Group Ltd., UK, DHI Water & Environment, Halcrow Bangladesh Ltd. and Kranti Associates Ltd. Tk. 26,025.00 lacs. Sep’03-Dec’04
12. South-West Flood Damage Rehabilitation Project (Part-D: Water Management and Drainage Facilities) ADB BWDB 13.05 Feb.’01-Jun’04
13. Feasibility Study and Detailed Design of Subprojects under Second Small Scale Water Resources Development Sector Project, ADB Loan No. 1831-BAN (SF)/TA NO:3683-BAN ADB LGED Tk. 41,418.00 Lacs. Jan’03-Dec’06
14. Feasibility Study for a Comprehensive Study for Drainage and Flood Management for Manu-Dhalai-Kushiyara-Khowai System. BWDB BWDB Development Design Consultants Ltd. Tk. 131.00 Lacs Sep.’01- Jun.’03
15. Options for the Ganges Dependent Area (OGDA) IDA WARPO Halcrow (UK), MottMacDonald (UK), DHI (Denmark), NRCE (USA), BETS (BD), Proshika & Asso. (NGOs) 0.02 Sep.’00-Jun.’02
16. Rehabilitation of Damaged Soft Protection and Installation of Hard Protection at Gazaria under Kalni-Kushiyara River Management Project CIDA CHC Tk. 137.20 Lacs Jun’01–Jun.02
17. Jamuna-Meghna River Erosion Mitigation Project ADB BWDB Halcrow Tk. 35,580.00 lacs. Nov’01–May.’02
18. National Water Management Plan (NWMP) IDA WARPO Halcrow, Mott. MacDonald, DHI, NRCE, BETS, HCL, ECA, Proshika, and ASOD, Bangladesh Tk. 4,229.00 lacs. Mar.’98-Feb.’02
19. Secondary Towns Integrated Flood Protection Project, Detailed Engineering Design and Construction Supervision ADB BWDB Halcrow, UK. Tk. 28,919.64 Lacs Apr.’94-Jun.’02
20. Feasibility Study for Comprehensive South Comilla and North Noakhali Drainage Project BWDB BWDB ACE Tk. 200.00 Lacs Nov’00-Oct’01
21. Feasibility Study for Dekar Haor Flood Control and Drainage Project (Modified) Including of Improvement of Drainage System of Derai-Jagannath Area BWDB BWDB ECBL Tk. 69.77 Lacs. Jun.’00-Nov.’00
22. River Bank Protection Project IDA BWDB Halcrow, UK. Tk. 7,127.60 million Jan’96-Aug’00
23. Public Consensus Process (PCP) for Kalni-Kushiyara River Management Project CIDA/ ADB WARPO 39.56 Feb.’00-Jul.’00
24. Updating Feasibility for Kalni-Kushiyara River Management Project : PPTA-ADB – TA No. 3267-BAN. ADB WARPO Hydrosult Inc., Canada. Tk. 27,880.00 lacs. Feb.’00-Jul.’00
25. North-East Regional Water Management Project (FAP-6) CIDA BWDB/ WARPO

NWHC (Canada)

SNC-Lavalin Inc. (Canada)

BETS (B.Desh)

Canadian $ 21.3million Sep’89-Jan.’00
26. Water Sector Improvement Project WB BWDB Tk. 300.00 Lacs Sep.’97-Aug.’99
27. Feasibility Study for Dekar Haor Flood Control and Drainage (FCD) Project BWDB BWDB ECBL Tk. 49.00 Lacs Mar.’99-Sep.’99
28. Feasibility Study of Dampara Water Management Project – (FCDI Components) under North-East Regional Water Management Project CIDA WARPO

NWHC (Canada)

SNC-Lavalin Inc. (Canada)

BETS (B.Desh)

  Apr.’93-Dec.’97
29. Second Bhola Irrigation Project (Detailed Design & Implementation Plan, ADB Loan No.1159-BAN) ADB BWDB Sir M.MacDonald  & Partners Ltd. UK., DDC, Kranti Associates Ltd. (Bangladesh) BDT 1,779.227 million Mar.’94-Oct.’97
30. Jamalpur Priority Project (FAP 3.1) Phase II (Peoples Consultation, EIA and Project Refinement-Firm Tranche EEC FPCO/ BWDB Sorgrea (France), Halcrow (UK), AQUA Consultants (Bangladesh) 59.33 Jun.’94-Jun.’97
31. Matamuhuri Irrigation Project, Feasibility Study/Survey BWDB BWDB 20.62 Oct.’95-Mar.’96
32. Implementation of Minor Irrigation Component of IFAD Assisted Special Project IFAD LGED 78,711.00 lacs. Sep.’92-Dec.’95
33. Brahmaputra River Training Study (BRTS, FAP-1), Follow up Study IDA BWDB Sir William Halcrow & Partners Consultants Oct.’93-Jul.’94
34. Command Area Development Project ADB BWDB BDT 21,605.00 Lacs Oct.’93-Apr.’94
35. Advisory Services for Review of the Design of Silt Trap and Desiltation of Teesta Barrage BWDB BWDB BDT 70,980.00 lacs. Nov.’93-Mar.’94
36. Ganges Kobadak Irrigation Rehabilitation Project, Phase-II ADB/ UNDP BWDB Hydraulic Research Willinfort U.K 62.50 May’91-Jun.’94
37. Jamalpur Priority Project (FAP‑3.1), Phase I EEC FPCO/ BWDB Sogreah,Lahmeyer, Halcrow   Jul.’91-Feb.’93
38. South-West Area Water Resources Management Project (FAP-4, TA No. 1498‑BAN) ADB FPCO/ BWDB Sir William Halcrow & Partners Ltd.,Danish hydraulic Ins. BDT 588.00 lacs. Oct.’91-May’93
39. Brahmaputra River Training Study, FAP-1 (Cr. No. 1870-BD), Feasibility Study IDA BWDB Sir William Halcrow & Partners Ltd.,Danish hydraulic Ins.   Mar.’90-Feb.’93
40. Secondary Towns Integrated Flood Protection Project, Bridging Consultancy for Detailed Design ADB/ WB BWDB Sir William Halcrow and Partners Ltd BDT 26,249 lacs Jul.’92-Jan.’93
41. Secondary Towns Integrated Flood Protection Project (FAP-9A, TA No. 1396-BAN), Feasibility Study ADB FPCO/ BWDB Sir William Halcrow and Partners Ltd. (Lead Firm)   May’91-Mar.’92
42. Greater Dhaka City Integrated Flood Protection Project, Feasibility Study (FAP-8A) JICA FPCO/ BWDB Pacific Consultants International, Japan   Oct.’90-Mar.’92
43. Third Flood Control and Drainage Project, FCD-III (BGD/85/029) IDA BWDB

Sir William Halcrow and Partners Ltd.UK, Resources Development Consultants,

Sri Lanka

65.00 Jun.’86-May’92
44. BWDB Small Schemes Project (SSFCDI, IDA Financed) IDA BWDB Sir William Halcrow,& Partners Ltd. and RDC 54.00 Apr.’85-Dec.’92
45. Halda Irrigation Extension Project (Under SSFCDI Project, IDA Financed) IDA BWDB BDT 19,385.00 lacs. Jul’91-Dec’92
46. Second Pabna Irrigation and Rural Development Project ADB BWDB Mott Macdonald & Partners Ltd.(U.K) BDT 27,290.00 lacs. Apr’91-Sep’91
47. Greater Dhaka City Protection, Flood Inundation Study Project (FAP-8A), Phase-I JICA BWDB Pacific Consultants International, Japan   Nov’90-Mar’91
48. National Water Plan Project, Phase-II (BGD/85/076) UNDP BWDB Harza Engineering(USA) and Mott Macdonald & Partners  Ltd. BDT 1440.00 Lacs Dec’88-Jun’91
49. System Rehabilitation Project (BGD/84/010), 21 Sub-projects UNDP/WB BWDB Harza Engineering(USA) and Mott Macdonald & Partners Ltd. 100.00 Jun’86-Nov’89
50. Haor Development Project (Phase-I) CIDA/ UNDTCD/ WB BWDB SLI/NHC   May’89-Aug’89
51. Small Scale Flood Control, Drainage and Irrigation (SSFCDI) Project, Phase-III (IFAD Financed) IFAD BWDB Resources Development Cons.Sri Lanka 11.40 Aug’84-Jul’88
52. Chenchuri Beel Irrigation Project (Under SSFCDI, IDA Financed) IDA BWDB Sir William Halcrow and Partners,U.K BDT 26.00 lacs. Jan’86-Oct’86
53. Flood Damage Repair Estimate, 1984 Flood WB     Dec’85-Dec’85
54. BWDB System Rehabilitation Project (UNDTCD/World Bank), Feasibility Study UNDP/WB BWDB Harza Engg. Company International(USA)   Feb’84-Oct’84
55. Small Scale Flood Control, Drainage Irrigation (SSFCDI) Project, Phase-II (IFAD Financed) IFAD BWDB

Resources Development Consultants,

Sri Lanka

14.00 Apr’83-Feb’84
56. Two Beels Drainage Project (Boalmari and Baliakandi Thanas under Faridpur District)   LGED BDT 21.41 lacs. Feb’83-Jun’83
57. Special Study on Barisal Irrigation Project WB BWDB BDT 2,572.45 lacs. Oct’83-Dec’83
58. Small Scale Flood Control, Drainage and Irrigation (SSFCDI) Project, Phase‑I (IFAD Financed) IFAD BWDB BDT 3,734.00 lacs. Mar’82-Sep’82
  1. ROAD, BRIDGE, CULVERT AND RURAL INFRASTRUCTURE DEVELOPMENT
Sl. No. Project Name Client Associate Consultant

Project Cost

(mil USD)

Project

Period

Funding Agency Exec. Agency
1. In-depth Monitoring Study of the Project titled “Greater Dhaka Sustainable Urban Transport Project (BRT Gazipur-Airport)” GOB IMED DECL   Mar’20-Jun’20
2. Consultancy Services for carrying out Feasibility Study and Preliminary Design of Flyover at Begumgonj Intersection to Chowmuhani Bazar ( 33rd to 36th km) of Feni-Noakhali National Highway (N-104) under Noakhali Road Division of RHD. RHD RHD Engineering Science Ltd. (ESL)  

Jan’18-

Jul’18

3. Consultancy Services for Hydrological and Morphological Study of 14 Bridges over Different River at Kishoreganj, Mymensingh, Jamalpur, Rajbari, Kushtia, Narayanganj, Tangail, and Gazipur Districts (Package No. CIB-S-58) LGED LGED S&F 490.845

Sep’17-

Jun’18

4. Consultancy Services for Hydrological and Morphological Study of 14 Bridges over Different River at Naogaon, Dinajpur, Lalmonirhat, Pabna, Natore, Comilla , Feni, Chittagong, and Cox ‘s Bazar Districts (Package No. CIB-S-60) LGED LGED S&F 490.845

Sep’17-

Jun’18

5. Consultancy Services for Hydrological and Morphological Study and Environmental Impact Assessment (EIA) for Construction of 120.00m Long RCC Bridge on Achintapur UP H/Q – Bhalukapur Bazar Road over Jalburunga River under Gouripur Upazila, Dist. Mymensingh. LGED LGED S&F 2.00 Oct.16-Nov.16
6. Consultancy Services for Supervision of 11 (Eleven) Nos. Bridges Construction Work of Purbachal New Town Project RAJUK RAJUK SARM 1066.67 Jan’13-Apr’16
7. Providing Consultancy Services for Detailed Design, Supervision and Monitoring for the Construction of Road, Bridges and Culverts of Extension of Madani Avenue (from Progoti Sarani Intersection to Balu River). RAJUK RAJUK SARM-EPC 32.16 Jun’11-Feb’15
8. Consultancy Services for Sub-soil investigation, structural Design, Estimate & Supervision for Bridge/Culvert under Union Infrastructure Development Project (Khulna, Bagerhat & Satkhira district) Project. LGED LGED EPC-ESL 39.84 Mar’11- Feb’14
9. Consulting Services for Supervision of 7 Nos. of Bridge Construction Work of Purbachal New Town Project. RAJUK RAJUK SARM, BETS 49.56 Dec’09-Jun’11
10. Construction of 3 Numbers of Bridges 1 in Sonargaon Janapath in between 1st and 2nd Phase across the existing lake, and rest of the 2 bridges over the lake in Uttara 3rd Phase. RAJUK RAJUK 304.72 Jun’06-Feb’14
11. Consultancy Services for Feasibility Study and Conceptual Design for the Construction of Flyover from Paltan to Dhaka-Mawa Road via 4th (New) Bridge Over Buriganga River RAJUK RAJUK Devcon-EPC   Mar’11-Mar’ 14
12. Consultancy Services for Preparation of Detail Structural Design, Estimate, Technical Specification and Standard Tender Document of 02 (Two) Bridges under Manikgonj District under Feasibility Study in Terms of Hydrological and Morphological Study, Environmental Impact Assessment (EIA) including Topographical Survey & Design of Important 02 (Two) Bridges under Manikganj District GoB LGED SARM 0.06 Oct’13-Dec’13
13. Technical Assistance (Design & Supervision; Market & Institutional Development; Gender & Sociology; Monitoring & Evaluation; NGO Coordination & Training) to MIDPCR IFAD LGED ESL and BETS 43.29 Feb’08-Jun’13
14. Detailed Design, Supervision and Monitoring for the Construction of Roads, Bridges/Culverts of Purbachal Link Road (Debogram – Progoti Soroni connecting Road) RAJUK RAJUK SARM and DatEx 48.31 or BDT 3,816.50 million Mar’09- Nov’12
15. Design, Supervision and Institutional Support Consultancy Services for Eastern Bangladesh Rural Infrastructure Development Project (EBRIDP). JBIC LGED WSP Inc. Katahira, DEVCON, & DIVINE Bangladesh. 142.00 or BDT 9,949.00 million May’06-June’11
16. Consultancy Services for Design of a Bridge Over Channel-2 in Modhumoti Model Town at Aminbazar, Dhaka Metro Makers & Developers Ltd. Metro Makers & Developers Ltd.   Jan’10-Jul’10
17. Conducting Detailed Design for Railway Overpass and Road connecting between Bijoy Sarani and Tejgaon Industrial Area, Dhaka RAJUK RAJUK SARM 16.63 Mar’08-Apr’10
18. Consultancy Services for Design, Supervision & Monitoring, Contract Package‑S1, (North Western & Central Parts) under Rural Transport Improvement Project (RTIP) of RDP-26. IDA LGED Hifab, DHV, RPMC

255.00 or

BDT 24,462.50 million

Jan.’04-Mar’09
19. Feasibility Study and Detailed Engineering of Dhaka-Chittagong 4-Lane Access Controlled Highway [ADB Loan No. 1789-BAN(SF)]. ADB RHD SNC-LAVALIN Int.  Inc., Canada. SAI., India. PUL and KPL-Bangladesh. BDT 16.72 crore Dec’06-Dec’08
20. Greater Noakhali and Chittagong District Feeder Road Project IDB LGED DEVCONsultants Ltd. BDT 2,768.80 million Sep’04-Jun’08
21. Study on Aid Effectiveness in the Infrastructure Sector, Bangladesh. JBIC JBIC 0.02 Feb’08-Apr’08
22. Assistance in Local Level Development through Coordination & Participatory Planning and Better Functioning of Union Parishad Complex as one Stop Service Centre constructed under Services of Greater Faridpur Rural Infrastructure Development Project (RD‑24). JBIC LGED WSP Inc., UK., DHV-Netherlands, EPC & DEVCON. 84.23 or BTD 4,759.22 million Jul.’06-Jun.’07
23. Design Supervision, Implementation Monitoring and Institutional Strengthening for Effective Evaluation & Monitoring of Greater Faridpur Rural Infrastructure Development Project (GFRIDP/RDP‑24). JBIC LGED WSP Inc., UK., DHV-Netherlands. EPC & DEVCON. BDT 4,759.22 million Jul.’06-Jun.’07
24. Greater Faridpur Rural Infrastructure Development Project, RDP-24 (D&S Consultancy Services) JBIC LGED WSP Int. (UK), DHV Int. , The Netherlands, DEVCON & ECA, BD. BDT 4,759.22 million Jul’02-Jun’06
25. Improvement of Feeder Road Type-A under Third Road Rehabilitation and Maintenance Project RRMP‑III IDA RHD

ICT Pvt. Ltd. (India)

Sverdrup Civil Inc. (USA)

ESL (BD)

PUL (BD)

115.55 May’99-Jun’05
26. Design and Supervision of Sylhet Feeder Road Project, Phase-IV IDB LGED BDT 1,574.00 Lacs. Sep’01-Mar’05
27. Third Rural Infrastructure Development Project, RDP-21 (Phase-I&II) ADB LGED Hifab, OSG, MML, JOC, DDC, RPMC BDT 83,284.00 Lacs. Jan’99-Jan’05
28. Road Network Improvement and Maintenance Project, TA No. 3508, RHD-ADB ADB RHD Louis Burger (U.S.A.), Bangladesh Consultants Ltd. (BD) BDT 108,615.30 lacs. Jun’01-Dec’01
29. Construction of Feeder Road Project in North-East Region of Bangladesh (Phase-III) IDB LGED None BDT 1,574.00 million Jan’98-Dec’00
30. Infrastructure Greater Sylhet District, RDP-3, Phase.-I, II, & III. IDB LGED BDT 1,574.00 million Apr’92-Nov’00
31. Designed 160 metre long one Balanced Cantilever RCC Bridge over Old Brahmaputra River in Belabo Thana under Narshingdi District. LGED LGED BDT 179.77 Lacs. 1998-2000
32. Infrastructure in Greater Khulna, Jessore and Kushtia, RD-18. ADB LGED HIFAB, SMEC, BECA Warley BDT 47,066.00 Lacs. Sep’93-Jun’00
33. Project Management Consultancy of Bangabandhu (Jamuna) Multipurpose Bridge Project. IDA, ADB, OECF JMBA

Price Water House, UK

Sir William Halcrow & Partners Ltd. UK.

Rahman & Rahman Huq, BD

905.45 Sep’94-Jun’98
34. Sheikh Mujib Road Culvert UNCHS CCC BDT 178.00 lacs. Feb’94-Jun’97
35. Third Flood Rehabilitation Project in 37 Districts and 52 Pourashavas IDA LGED RDC (Sri Lanka) 24.80 Dec’89-Dec’93
36. Rural Roads and Market Improvement and Maintenance Project in 29 District and 41 Pourashavas IDA LGED Resources Development Consultants Ltd. (Sri Lanka) 10.40 Jul’89-Jun’93
37. Consultancy for construction of Bridges and Culverts USAID DRR BDT 4,880.00 lacs. Aug’88-Apr’90
38. Second Flood Damage Rehabilitation Project WB LGED 25.00 Jul’87-Jun’89
39. Flood Damage Rehabilitation Project (Inventory) IDA LGED BDT 2,926.00 lacs. Aug’87-Sep’87
40. Flood Damage Rehabilitation Project, Phase-I IDA LGED Resources Development Consultants Ltd. (Sri Lanka) 8.29 Jul’85-Jun’87
41. Road Rehabilitation and Maintenance Project, Phase‑II (Under RHD) IDA RHD Snoy Mountains Engg. Corporation, Australia BDT 50,196.00 lacs. Apr’86-Jun’87
42. Rehabilitation/Reconstruction of Structures (Bridges and Culverts) in 7 Districts IRWP Norway Tech. Asstt.  MacDonald & Partners Ltd.   Jul’85-Mar’86
43. Road Rehabilitation and Maintenance Project, Phase-I IDA RHD Snowy Mountains Engg. Corporation, Australia   Jul’85-Mar’86
44. Rural Road Project (Feasibility Study)   LGED   Jun’84-Dec’84
45. Rural Development Project, Phase-II, LGRD (Loan No. 524-BAN-SF). ADB LGRD   Mar’82-Jul’83
46. Feasibility Study of Two Thanas namely, Iswarganj and Nandail thanas under the Intensive Rural Works Project, Phase-I NCRDIC LGRDC BDT 245.52 million 1979-1981
  1. URBAN AND MUNICIPAL DEVELOPMENT, PHYSICAL PLANNING
Sl. No. Project Client Associate Consultant

Project Cost

(mil USD)

Project Period
Funding Agency Exec. Agency
1. Preparation of Master Plan for Rangpur Divisional Town under District Towns Infrastructure Development Project GoB LGED Data Experts, Ehsan Khan Architects Ltd. 0.52 or BDT 36.28 million Aug’11-June’14
2. Management & Supervision Consultancy (Pack S2) for Municipal Services Project, Phase-II (MSP-II), IDA Cr. No. 4761-BD under Bangladesh Municipal Development Fund (BMDF) IDA BMDF Aqua, Hifab, RPMC, EPC   Apr’11-Sep’12
3. Technical Assistance (TA) for Extended Municipal     Capacity Building Program and Preparation of Municipal Services Project-II : Preparing Frameworks for Municipal Development   Interventions (IDA 4761). IDA LGED MottMacDonalds BDT 280.70 million Oct’11-Apr’12
4. Preparing Structure Plan, Master Plan, and Detailed Area Plan for the extension of the Khulna Master Plan Area Upto Mongla Town. KDA KDA Sheltech Consultants (Pvt.) Ltd. 0.85 Apr’07-Dec’11
5. Design & Supervision Consultancy Services for Emergency 2007 Flood Restoration and Recovery Assistance Program (Municipal Services Project – Contract No. S‑275) IDA LGED AQUA 122.76 Jun’08-Jun’10
6. Preparation of Structure Plan, Master Plan and Detailed Area Plan for Barisal Divisional Town. UDD UDD Sheltech Consultants (Pvt.) Ltd. BDT 552.00 lacs. Jul.’06-Jun’10
7. Preparation of Structure Plan, Master Plan and Detailed Area Plan for Sylhet Divisional Town. UDD UDD Sheltech Consultants (Pvt.) Ltd. BDT 552.00 lacs. Jul.’06-Jun’10
8. Preparation of Detailed Area Plan (DAP) for Dhaka Metropolitan Development Plan (DMDP) under RAJUK  (Group-D). RAJUK RAJUK Data Experts (P) Ltd. 0.08 Aug’05-Jun’10
9. Preparation of Detailed Area Plan (Group-B) for Dhaka Metropolitan Development Plan (DMDP) under RAJUK. RAJUK RAJUK Data Experts (P) Ltd. 0.57

Aug’04-Jun’10

 

10. Planning and Designing of Various Infrastructural and Utility Plans and Components with Ancillary Works for Purbachal New Town Project. RAJUK RAJUK SARM, BETS 485.00 Or BDT 33,110.00 million Jun’06-Oct’08
11. Design & Supervision Consulting Services for 2004 FDRP (Urban Sector under MSP), IDA Credit No. 3177-BD. IDA LGED AQUA Consultants Ltd. BDT 1,667.11 million Apr.’05-Jun.’07
12. Municipal Services Project (Design, Supervision and Monitoring Consultancy Services) WB LGED

Louis Berger (USA), Halcrow UK Ltd

AQUA

BDT 6,751.80 million Dec’99-Feb’05
13. Urban Governance and Infrastructure Improvement Project ADB LGED DHV, The Netherlands   Nov’01-Jun’02
14. Municipal Services Project IDA LGED Mott MacDonald Limited (UK), Aqua Consultant and Associated Ltd. BDT 608.00 lacs. Apr’94-Aug’98
15. Preparation of Structure Plan, Master Plan and Detail Area Plan for Dhaka City UNCHS (HABITAT) RAJUK

Mott MacDonald International Ltd.

Culpin Planning Limited (U.K.)

Dev. Adm. Group (University of Birmingham, U.K.)

AIT, Consociate Ltd. (Dhaka)

BDT 1,549.00 lacs. Apr’92-Jul’96
16. Support for Urban Management and Municipal Services Programmes, Dhaka City

UNCHS

(Habitat)

DCC

Sir M.Mott MacDonald International Ltd.

Culpin Planning Limited (U.K.)

24.84 Jun’90-May’94
17. Support for Urban Management and Municipal Services Programmes, Chittagong City

UNCHS

(Habitat)

CCC

Sir M.Mott MacDonald International Ltd. (U.K.)

Culpin Planning Limited (U.K.)

24.84 Jun’90-May’94
18. Reconstruction of Rural Houses in Flood affected areas all over Bangladesh UNCHS/ UNDP   DOXIADIS ASSOCIATES, GREECE   Jul’91-Dec’93
19. Secondary Towns Infrastructure Development Project-II, T.A. No. 1466-BAN ADB LGED Gherzi Eastern Limited, Bombay BDT 36,400.00 lacs. Nov’92-Sep’93
20. Landuse/Master Plan of Bandarban Pourashava UDD UDD   1989-1991
21. Landuse/Master Plan of Ramu and Rowangchari Upazilas (Presently Thanas) UDD UDD   1989-1991
22. Landuse/Master Plan for Perojpur Pourashava UDD UDD   1989-1990
23. Landuse/Master Plan for Babuganj, Swarupkati and Rajapur Upazilas (Presently Thanas) UDD UDD   1985-1988
24. Master Plan for Jhenaidah Pourashava UNCHS UDD   Sep’85-Sep’86
25. Landuse/Master Plan of Muladi, Hizla and Mehendiganj Upazilas (Presently Thanas) UDD UDD   1983-1984
  1. ARCHITECTURAL & CIVIL ENGINEERING PROJECTS
Sl. No. Project Client Associate Consultant

Project Cost

(mil USD)

Project

Period

Funding Agency Exec. Agency
1. Consultancy Services for Contract Management, Design and Construction Supervision of 10 Number School cum Cyclone Shelters for the victims of Cyclone SIDR under Fael Khair Program Bangladesh-(Package‑9) Project No. BD1-0027 IDB LGED 130.00 Mar’14-Apr’18
2. Consultancy Services for Contract Management, Design and Construction Supervision of 9 Number School cum Cyclone Shelters for the victims of Cyclone SIDR under Fael Khair Program Bangladesh- (Package-10) Project No. BD1-0027 IDB LGED 130.00 Mar’14-Dec’17
3. Consultancy Services for Contract Management, Design and Construction Supervision of 39 Number of School cum Cyclone Shelters for the victims of Cyclone SIDR under Fael Khair Program Bangladesh- (Package-3, 4 & 5) Project No. BD1-20. IDB LGED 130.00 Sep’12-May’17
4. Construction of DCC Market in Sutrapur Area of Ward No. 80. DCC DCC   Oct’05-May’17
5.

Consultancy Services for Preparation of Architectural and Structural Design including Sanitary, Plumbing, Electrical and Estimation and Preparation of Tender Documents for

Construction of (a) 15 (Fifteen) Storied and (b) 7 (seven) storied (with 2 Basement) Office cum Commercial Building for Tongi Bhaban at Tongi, Gazipur City Corporation, Gazipur.

GCC GCC 12.20

Jun.’15-

Jun.’16

6. Engineering Management Consultancy (EMC) for Construction of Server Stations for Electoral Database (CSSED) UNDP LGED/ UNDP/ PWD RDC, Sri Lanka.   Dec.’13-Dec.’14
7. Engineering Services for Implementation of Pilot Project – Financial Assistance towards Islamic Educational Institution and Orphanage in Bangladesh. IDB-BISEW IDB 1.62 Aug’05-Feb’14
8. Construction of Upazila and Regional Server Stations for Electoral Database (CSSED) Project GoB & UNDP NEC, Secretariat BDT 35,591.00 Lacs. Mar’12-May’13
9.

Consultancy Services for Fael Khair School cum Cyclone Shelter Program for the victims of

Cyclone SIDR – Site Survey and Selection, Soil Investigations, Detailed Design, Preparation of

Tender Documents

IDB LGED 130.00 May’09- May’13
10. Construction of 10 storied Community Center cum Super Market at Narayanganj. Narayan-ganj Poura-shava Narayan-ganj Poura-shava Taka in Crore: 80.00

Jun’07-Feb’08

 

11. Consultancy Services for Construction of Six storied Tan Bazar Park Super Market at Tan Bazar beside SA Maleh Road, Narayanganj Narayan-ganj Poura-shava Naraya-ganj Poura-shava 2.46 Oct’05-Feb’08
12. Construction of 2800 Core Shelters for SIDR Affected Coastal Areas of Bangladesh Govt. of India Indian High Commi-ssion CES, India   Aug’08-Dec’11
13. Planning, Design & Construction Supervision for Out Patient Department (OPD) at Uttar Khan, Dhaka. MHWT MHWT   Jun’09-ongoing
14. Consultancy Services for Extension of Kalabhaban for Department of Theatre and Music, Dhaka University. Govt. of India Indian High Commission CES, India BDT 22.86 million Feb’09-Dec’11
15. Design and Fabrication of Rath at Dhamrai Govt. of India Indian High Commission CES, India BDT 7.86 million Aug’08-Jul’10
16. Construction of Second Academic Building for Islamic University of Technology under IDB Assistance (BD-131) IUT/ IDB IUT 3.764 Jun.’05-Jun’10
17. Feasibility Study of 20-Storied Commercial Building at Agargaon Administrative Area, Dhaka. IDB-BISEW IDB   Apr’07-Sep’07
18. Extension and Development of Tourism through Development of Land full of Natural Beauty and having Diversified Culture in Hill Tracts. CHTDB CHTDB   Jun.’06-Sep.’07
19. Feasibility Study for Construction of One New ICD near Dhirasram Railway Station in Gazipur District under the proposed Export Infrastructure Development Project  (IDA Grant # H-107 BD) IDA CPA/  BR CES (India) Pvt. Ltd.   Aug’06-Jun’’07
20. 100 Bedded Mujibur Rahman Memorial Diabetic Hospital at Kushtia. DAB DAB   Feb’03-Aug’05
21. Extension and Development of Sylhet Railway Station BR BR   BDT 1,460.00 lacs. Apr’98-Jan’04
22. 16-Storied Commercial Building (Sattara Centre) at Naya Paltan, Dhaka Mr. Abdus Sattar Mr. Abdus Sattar   Sep’96-Nov’03
23. Construction of 6-storied building having Indoor Swimming Pool cum Multipurpose hall, Lamda Hall and Auditorium over existing pool complex of Gulshan Club Ltd. GCL GCL   Jul’01-Sep’03
24. Construction of Quarter for Professors and the Equivalent Personnel of Khulna University KU, Khulna KU, Khulna   Apr’00-Dec’02
25. Consultancy Services for Construction of 20-storied Corporate Building of AB Bank Ltd., 82 Kakrail, Dhaka. AB Bank Ltd. AB Bank Ltd. Architekton Pvt. Ltd.   Jun’99-Jun’02
26. 25 Bed Diabetic Hospital at Jhenaidah, Jessore, Sylhet, Faridpur,Bogra, Narsingdi &Feni DAB DAB BDT 15.23 million Sep’96-Dec’01
27. Development of Tourism Facilities at Shatnal BPC BPC   Sep’99-Dec’01
28. Repair/Renovation of Clinic Buildings and Construction of Staff Quarters in 18 MCWCs (4th Phase) UNFPA UNFPA/ DFP   Dec’97-May’01
29. Medical College for Women and Hospital at Uttara, Dhaka. MHWT MHWT BDT 15.00 million Jun’96-Mar’00
30. 20-Storied Factory Building of Woodland Apparels Ltd. at Mirpur, Dhaka, constructed upto 12 floors in 1st Phase. Woodland Apparels Ltd. Woodland Apparels Ltd.   Jul’96-Dec’99
31. Further Development of Rajshahi District Stadium NSC NSC BDT 307.00 lacs. Jun’98-Jun’99
32. Construction of 10-Storied Out Patient, Diagnostic, Administrative Department (Block-A) at Uttar Khan. MHWT MHWT  

Dec’97-Nov’98

Design Completed.

33. 6-Storied Indoor Swimming Pool Plus Multipurpose space for Gulshan Club (Constructed upto 1st Floor) GCL GCL BDT 1.50 million Nov’96-Sep’98
34. Needs Assessment of upgrading of 19 MCWCs and production of Design Drawing – 2nd Phase (Ref. BGD/91/P02) UNFPA UNFPA/ DFP   Dec’96-Jun’98
35. Construction of Inland Container Depot (ICD) for Bangladesh Railway at Kamalapur, Dhaka. BR BR BDT 8,400.00 lacs. Feb’97-Dec’97
36. Feasibility Study for a Proposed Container Yard at Chittagong. Maersk BD; Wal Carlbro; Int. Inc. “K” Line (BD)   Feb’97-Mar’97
37. Hotel Saint Martin (9 storied) at Agrabad, Chittagong Hotel Saint Martin Ltd. Hotel Saint Martin Ltd. BDT 7.00 million Aug’91-Nov’97
38. Works at the Institute of Forestry, Chittagong University under Forest Resources Management Project IDA Institute of Forestry BDT 1,6133.03 Lacs Aug’94-Feb’96
39. Works under Fisheries Training and Research Project (Bangladesh Agriculture University, Mymensingh) BAU BAU BDT 2.02 million May’95-Jan’96
40. Construction of Seed Pathology Laboratory under Plant Pathology Department BAU BAU BDT 30.00 Lacs. Feb’95-Jun’95
41. Preparation of Master Plan for Housing Complex of Bangladesh Railway in East Zone BR (East Zone) BR (East Zone)   Jan’95-Jun’95
42. Various Development Works of National Botanic Garden, Mirpur, Dhaka MEF MEF BDT 1.20 million Feb’91-Jun’95
43. Remodelling of Chittagong Railway Station and Preparation of Master Plan for Beautification and Commercial & Residential Use of land near Chittagong Railway Station BR (East Zone) BR (East Zone)   Feb’95-Apr’95
44. Modernization of Dhaka Railway Station at Kamalapur and Preparation of Master Plan BR (East Zone) BR (East Zone)   Dec’94-Apr’95
45. Master Plan to Assess the Need of Rehabilitation and Maintenance of Existing Food Godowns and Construction of New Godowns Upto the year 2000 A.D. MOF MOF   Jun’92-Jun’93
46. Galco Steel Mills, Narayanganj, Dhaka Galco Steel Limited, INDIA Galco Steel Limited BDT 2.75 million Jun’88-Dec’91
47. Hotel Saint Martin (10-storied) at Agrabad, Chittagong (Three Star Hotel) Hotel Saint Martin Ltd. Hotel Saint Martin Ltd. BDT 12.50 million Jul’89-Aug’91
48. Union Seed Stores under Extension and Research Project-II, Comilla and Barisal District MOA MOA Prokaushali Sangshad Limited   1986-1989
49. Chittagong Urea Fertilizer Project ADB Chittagong Urea Fertilizer Ltd. UNICO, Japan   Jan’84-Sep’89
50. Design of Naval Jetty, Chittagong BN BN Sthapataya Silpa Ltd.   1982-1988
51. Re-Rolling Mills, Dhaka (Jupitar Steel Mills) Jupitar Steel Mills Ltd. Jupitar Steel Mills Ltd.   1985-1988
52. Construction of Fertilizer Storage Godown (CIP-II) at Shambhuganj and Parbatipur ADB BADC BDT 500.00 million 1985-1987
53. Construction of Multi-storied Shopping & Commercial Building Complex, Dhaka (ABC Plaza, a 16- storied Commercial Building at Mohakhali C/A, Dhaka) M/s. Chowdhury Sons Ltd. M/s. Chowdhury Sons Ltd. BDT Tk. 350.00 million 1985-1987
54. Construction of Multi-storied Commercial Building Complex, Dhaka (for H.R. Holdings Ltd. at 15-storied building) M/s. Karnaphuli Ltd. (H.R. Holding) M/s. Karnaphuli Ltd. (H.R. Holding) BDT 7.00 million 1985-1987
55. Textile Mills Upgrading and Renovation at Sohagpur, Narayanganj Sohagpur Textile Mills Ltd. Sohagpur Textile Mills Ltd.   Jul’86-Nov’87
56. 24-Storied Multi-purpose Building M/s. Salena Holding Ltd. M/s. Salena Holding Ltd.   Jul’86-Sep’86
57. Preparation of Architectural, Structural, Electrical, Sanitary and Water Supply Design and Detailed Drawings and Top Supervision of 6 Storied Building of Chairman of BSCIC at Gulshan, Dhaka. BSCIC BSCIC BDT 10.00 Lacs. 1983-1986
58. Garments Factory at Tongi (Elite Garments) Elite Garments Industries Elite Garments Industries BDT 1.75 million 1983-1985
59. Interior Design of Building of Arab Bangladesh Bank, Chittagong A.B. Bank A.B. Bank   1984
60. Flour Mills at Gazipur (Mymensingh Flour Mills) Mymen-singh Flour Mills Mymen-singh Flour Mills BDT 3.00 million Nov’83-Oct’84
61. Architectural Design, Drawing and Construction Supervision of 11 Storied Bangladesh Medical Association Complex comprising Shopping Counter, BMA Auditorium, Sunday Clinic at Toplhana Road, Dhaka. BMA BMA BDT 3.50 Crore 1979-1983
62. Interior Renovation of Indo-suez Bank at Dhaka and Chittagong Banque Indosuez Banque Indosuez 1982
63. Consultancy Services for Architectural Design, Structural, Pile Design, Soil Investigation, Electrical Sanitary, Water Supply, Lifts of 7-Storied Office Building of Mr. Mukhlesur Rahman, Owner of Uttara Motors at Chittagong. Uttara Motors Uttara Motors BDT 2.25 Crore 1981-1982
  1. AGRICULTURE, HORTICULTURE, FORESTRY, FISHERIES, SOCIO-ECONOMIC, ENVIRONMENTAL AND RURAL DEVELOPMENT PROJECTS
Sl. No. Project Client Associate Consultant

Project Cost

(mil USD)

Project Period
Funding Agency Exec. Agency
1. Forestry Sector Project ADB DoFo Tecsult (Lead), Canada, SODEV, NRP, HCL of Bangladesh. BDT 38,900.00 lacs Jan’98-Jun’03
2. Forest Resources Management Project (Cr. 2397 BD) WB DOFo MADECOR, Philippines BDT 23,472.00 lacs Dec’94-Dec’98
3. Horticulture Baseline Production and Marketing Survey FAO DAE/ BADC/ BARI   Oct’94-Mar’97
4. Extension and Environmental Impact Monitoring and Evaluation Project ODA DAE ULG Consultants, England   Mar’94-May’94
5. Project Formulation Survey on Export Possibility of Agricultural Products in Bangladesh JICA JICA   Oct’92-Sept’93
6. Bench Mark Re-survey of Women in Development and Environmental Aspects WB BWDB   Feb’91-Mar’91
7. Third Fisheries Project (Investigation, Planning, Design) WB BWDB BDT 20,798.00 lacs. Apr’89-Oct’89
8. Ox-Bow Lake Small Scale Fishermen Project (Survey, Planning, Detailed Design, Working Drawings) IFAD BWDB BDT 300.00 million May’87-Jan’88
9. Socio-Economic Bench Mark Survey for Assessment of Impact of Sub-Projects WB BWDB   Mar’86-Jan’87
10. Minor Crops Development Project IFAD LGED   Jan’86-Apr’86
11. Rangamati Fishery Project (Survey, Planning, Detailed Design, Construction Supervision) BFDC BFDC BDT 75.00 Lacs. Feb’84-Apr’86
12. Study on the Estimation of Productive Capacities (Transport, Industries, Irrigation Equipment, Education and Health Sectors) PC PC   May’84-Feb’85
13. 100 Thana Intensive Rural Works Program, Phase‑III (Feasibility Study). IDA LGRD/ BWDB   Jun’84-Mar’85
14. Agro-Engineering Study under Rural Roads and Marketing Study. LGRD LGRD   Mar’84-Sep’84
15. Market Management Study, Rural Roads and Marketing Project. LGRD LGRD   Mar’84-Sep’84
16. Evaluation of the Impact of the New Marketing System for Distribution of Fertilizer in Bangladesh BADC BADC   Mar’83-Jun’84
17. Crop Intensification Project (CIP) ADB BADC BDT 317.06 lacs. Apr’84-Dec’84
18. Evaluation of T&V System under ERP-I in North-West Bangladesh WB MOA   Sep’82-May’84
19. North Kurigram Agricultural Development Project IFAD BWDB   Aug’84-Dec’84
20. 100 Thana (Ex-Upazila) Intensive Rural Works Programme, Phase-II (Feasibility Study) IFAD LGRD   Jan’82-Nov’83
21. Agro-Socio-Economic Survey under Tangail Agricultural Development Project. GTZ BADC   Jun’82-Sep’82
22. Customs Union in South-East Asia The Ford Founda-tion The Ford Founda-tion   Jan’80-Jun’80
23. Agro-Socio-Economic Survey IFAD BADC   Jul’79-Jan’80
24. Extent of Rural Unemployment in Bangladesh PC PC   Feb’78-Dec’78
  1. GROUND WATER DEVELOPMENT PROJECTS
Sl. No. Project Client Associate Consultant

Project Cost

(mil USD)

Project Period
Funding Agency Exec. Agency
1. Study to Forecast Declining Groundwater level in Bangladesh UNICEF DPHE Mott MacDonald Ltd. UK   Dec’93-Jun’94
2. IDA Deep Tubewells Project‑II ODA, UK/ IDA BADC

Sir M. MacDonald and Partners Ltd. (U.K.)

Hunting Technical Services Ltd.

BDT 20,134.00 lacs. Aug’83-Jun’92
3. Annual Evaluation Study of IDA Deep Tubewell II Project (Phase-II) IDA BADC   May’88-Jan’90
4. Special Ground Water Studies IDA MPO   Feb’84-Dec’86
5. Annual Evaluation Study of IDA Deep Tubewell II Project (Phase-I) IDA BADC   Aug’85-Aug’86
6. Groundwater Field Survey UNDP BWDB/ MPO BDT 880.00 lacs. Apr’84-Mar’85
7. Dhamrai Deep-Set Hand Pump Demonstration Project UNDP MPO   Apr’84-Mar’85
8. Groundwater Survey of Tanore Thana (Ex-Upazila) UNDP MPO   Mar’84-May’84
  1. EDUCATION SECTOR DEVELOPMENT PROJECTS
Sl. No. Project Client Associate Consultant

Project Cost

(mil USD)

Project Period
Funding Agency Exec. Agency
1. Introduction of Dakhil (Vocational) Courses in Selected Madrasha(s) (Phase-I) under the Assistance of IDB. IDB MOE BDT 3,648.69 Lacs Apr.’04-Dec’08
2. Emergency Flood Rehabilitation Programme in Secondary and Higher Secondary Educational Institutions Projects. IDA MOE   Feb’06-Jun’07
3. Preparation of Design Maintenance Manual for Primary School.   PMED     Nov’00-Feb’01
4. IDA Assisted Primary Education Development Project for Dhaka, Rajshahi and Khulna Division. IDA LGED BDT 87,073.00 lacs. Mar’03-Aug’03
5. Construction of 137 Selected Madrasha under the Assistance of Islamic Development Bank (IDB) IDB FD BDT 2,295.36 Lacs Mar’01-Jun’03
6. 2nd Primary Education Sector Project (Development of Primary Education in Chittaogng, Sylhet and Barisal Division) Phase-II (ADB-Loan-1521-BAN-SF). ADB MOE/  PIMU BDT 60,775.00 lacs. Nov’00-Feb’01
7. IDB Assisted Govt. Primary School cum Flood Shelter Construction Project IDB LGED BDT 5,438.14 Lacs. Oct’97-Jun’00
8. IDB Assisted Govt. Primary School Construction Project IDB LGED BDT 5,434.00 Lacs. Mar’95-Jun’97
9. Second Primary Education Sector Project ADB ADB   Apr’96-May’96
10. General Education Project (2118 BD) IDA Preparation of Back-up Report for Mid-Term Review IDA IDA   Jan’93-Feb’93
11. Higher Secondary Education Sector Project (T.A. No. 1294 to GOB) ADB ADB BDT 24,319.00 lacs.

Feb’91-Mar’91

Jul’91-Jul’91

12. Primary Education Sector Project for Chittagong Division (Project Appraisal T.A. No. 1136 to GOB) ADB ADB  

Apr’89-Nov’89

Oct’89-May’93

13. Post Secondary Science Education Project ADB ADB   Dec’87-Jan’88
  1. WATER SUPPLY, SEWERAGE, SOLID WASTE MANAGEMENT, SANITATION AND WATER TREATMENT PLANT PROJECTS
Sl. No. Project Client Associate Consultant

Project Cost

(mil USD)

Project Period
Funding Agency Exec. Agency
1. Consultancy Services for Design and Construction Supervision for 37 District Towns Water Supply Project (Revised) DPHE DPHE ORG, India BDT 8,990 million.

Jun’18-

Mar’20

2. Consultancy Services of Preparation of the Khilkhet Water Treatment Plant, TA-8053 BAN ADB DWASA Mott MacDonald Sep’12-Apr’13
3. Investigation, Design and Construction of 5MGD (937 M3 /h) Iron Removal Plant at existing 15MGD (2812 M3 /h) Kalurghat Iron Removal Plant CWASA CWASA Mott. MacDonald Ltd., UK   Nov’97-May’02
4. Construction Supervision of Intake Structure and Pumping Station (Package-1); Connecting Culvert (Package-3); Ancillary Structures of Treatment Plant (Package-5); Primary Transmission Main (Package‑6) and Design of Secondary and Tertiary Distribution System (Package‑7) under Fourth Dhaka Water Supply Project (Saidabad Water Treatment Plant) including defect liability. WB DWASA

BCEOM – French Engineering Consultants (France)

Mott MacDonald (U.K.), Persons Engineering Science (U.S.A.)

AQUA Consultant and Associates Ltd. & Dial Consultants Ltd. (Bangladesh)

US$

2.94 million

Jan’99-Jun’02
5. Construction Supervision of Supply and Installation of Electro-Mechanical Equipment and Civil Works of Saidabad Water Treatment Plant (225 mlds) under DWASA-IV Project (Package 4A & 4B) including defect liability period. France Govt. World Bank DWASA BCEOM, French Engineering Consultants (France) BDT 75,043.00 lacs. Jan’98-May ’02
6. Consultancy Services for Supervision of Civil Engineering Design Leading to Tendering of Civil Engineering Works (Contract-4B) of Saidabad Water Treatment Plant under DWASA‑IV Project. France Govt. World Bank DWASA BCEOM, French Engineering Consultants (France) BDT 75,043.00 lacs. May’96-Dec’97
7. Consultancy Services for Planning, Design etc. of Ancillary Structures of Saidabad Surface Water Treatment Plant (225 mld), 38 km Pipelines of 300~1800 mm Dia  under DWASA-IV Project. France Govt. World Bank DWASA BCEOM, French Engineering Consultants (France) BDT 75,043.00 lacs. Sept ‘95-Dec’95
8. Emergency Water Supply Project in Dhaka City (Feasibility Study and Detailed Engineering) including Detailed Design, Tender Evaluation and Construction Supervision (Amendment 1,2,3). French-Bangladesh Protocol DWASA BCEOM, French Engineering Consultants (France) BDT 75,043.00 lacs. Jan’90-Jun’95
9. Augmentation of Water Supply System (Bangladesh Agricultural University, Mymensingh) BAU BAU  

Jul’93-

June 97

10. Feasibility cum Project Preparation Study for Water Supply at Mongla Port, Township and EPZ DPHE DPHE BDT 500.00 million June 97-June 98
11. Programme for Performance Improvement in Mirpur, Revenue Zone-4, Dhaka WASA. WB DWASA IBCS-PRIMAX Software (Bd) ltd   Nov’’96-Dec’99
12. Water Supply and Sanitation Urgent Expansion Project, Dhaka, WASA-III. IDA DWASA Mott MacDonald Ltd. (U.K.) Camp Dresser & McKee (USA), Desh Upodesh Ltd. (Bangladesh) BDT 12,950.00 lacs. Nov’88 -Mar’98
13. Preparation of Case Study for Dhaka City Managing Water Resources to Meet Megacity Needs. ADB ADB   May’93-Jul’93
14. Dutch Aided Water Supply Project (18 District Towns, Monitoring Mission) Dutch Embassy DPHE   1993
15. Dutch Water Supply Project (12 District Town, Formulation Mission) Dutch Mission     Feb’93-Apr’93
16. 5-District Towns Water Supply Project – ADB (Mission Study) ADB DPHE   Oct’92-Dec’92
17. Dhaka Water Supply and Sewerage Preparation of Detail Drawing and Construction Documents for Water Treatment Plant at Demra and Other Works. IDA DWASA Camp Dresser and McKee (USA) Sir M. MacDonald International Ltd. (UK), DUL (Bangladesh) BDT 497.00 lacs. Feb’89-Feb’92
18. Water Supply and Sanitation Urgent Expansion on Project Dhaka Region Ground Water and Subsidence Study (IDA Credit No. 1734-BD) IDA DWASA

Sir M. Mott. MacDonald and Partners (UK),

Camp Dresser and McKee (USA)

DUL (Bangladesh)

  Aug’90-Jun’91
19. Sewerage and Storm Water Drainage Improvement at Bangladesh Tobacco Company (BTC) Factory Complex, Dhaka BTC BTC Mott MacDonald International Ltd.(UK)   Mar’90-Jun’90

3.5  Overseas Projects

Sl. No. Project Client Associate Consultant

Project Cost

(mil USD)

Project Period
Funding Agency Exec. Agency
1. Consultancy Services for Accurate Engineering Surveying, Designing, Supervision and Monitoring under the Project “Construction of Social Infrastructure Facilities for IDPs in Azerbaijan. IDB SFDI, Azer-baijan BETS (BD), Yeni Memar (Azerbaijan)   Jan’07-Dec’09
2. Second Pump Irrigation and Area Development Project, Burma. ADB   1989
3. Second UP Public Tubewell Project, India. IFAD   1986
4. Malakand Area Development Project, Pakistan. IFAD   1985
5. Rajsthan Command Area Development Project, India. IFAD   1983
6. Babai Irrigation Project, Nepal. WB Sir M.MacDonald and Partners, U.K.   1981-1982