Projects
List of On Going Projects
Sl. No. | Project Name | Client | Associate Consultant |
Project Cost (mil USD) |
Project Period |
|
Funding Agency | Exec. Agency | |||||
A. ROAD, BRIDGE, CULVERT AND RURAL INFRASTRUCTURE DEVELOPMENT | ||||||
1. | Feasibility Study of Proposed Dhour-Kadda-Salna Road (Approx. length is 18.800 km) under RHD, Dhaka Road Circle, Dhaka. | RHD |
RHD |
JV: EPC-Cheil, Korea. | 0.084 |
Sep’23- Jan’24 |
2. | Consultancy Services for Design and Supervision of Bangabandhu Sheikh Mujib Shilpa Nagar (BSMSN) Development Project (Package No.: PMC15-BSMSN-BEZA | BEZA |
WB |
JV: CHEIL, Korea (Lead)-Yooshin, Korea-EPC | 502.858 |
July’23- June’28 |
3. | Consultancy Services for Drainage Design Works of Dhaka Ashulia Elevated Expressway Project. | BBA |
PPP |
North China Municipal Engineers Design & Reearch Institute Co.Ltd.(NCME | 1586.98 | Jan’23-Jun’23 |
4. | Consultancy Services for Feasibility Study with Improvement of Different Intersections including Traffic Signal in Dhaka South City Corporation Area | DSCC | GoB | JV: EPC-BISR | – | Sep’22-Feb’24 |
5. | Consultancy Service for Construction Supervision of Sayedpur Bridge, Detailed Design of Hasnabad intersection, Detail Design & Estimate of 4-lane Bridge at Postagola and Preliminary Design of Buriganga Bridge at Fatulla, Narayanganj | RHD | GoB | DECL-EPC-Devcon | – | Jun’22-Oct’23 |
6. | Design and Supervision Consultancy Services for Construction of 1490m Kadamrasul bridge over the river Shitalakhya near 5no Gudaraghat of Narayanganj City Corporation (NCCKB) Project-Cable Stayed Bridge | LGED | LGED/ NCC | Dongsung, Korea(Lead)-DM, Korea-EPC-S&F | 150.00 |
Jan’20- Jan’23 |
7. | Consultancy Services for Design and Construction Supervision of 1470m long Paira Bridge (Lebukhali Bridge) over the River Paira on Barisal Patuakhali Road, Bangladesh (KFAED Loan No. 841)- Extradosed Bridge | KFAED | RHD | ICT-KUNHWA-NARCO | 182.04 | Jan.’14-Jun.’21 |
B. ARCHITECTURAL & CIVIL ENGINEERING PROJECTS | ||||||
8. | Consultancy Services for Construction Supervision of 16-Storied Residential Building Project, located at House # SW(3)-7, Road #7, Gulshan-1, Dhaka. | Private | Private | – | 28.31 | May 2017– May 2021 |
List of Completed Projects
- WATER RESOURCES DEVELOPMENT PROJECTS
Sl. No. | Project Name | Client | Associate Consultant |
Project Cost (mil USD) |
Project Period |
|
Funding Agency | Exec. Agency | |||||
1. | Consultancy Services for Feasibility Study of Capital Dredging and Sustainable River Management in Bangladesh | GoB | BWDB | CES, Demas, DHI, BETS & Devcon | 135.28 | Sep’11-Jun’15 |
2. | Consultancy Services for Environmental & Social Impact Assessment Study for the Pilot Project under Capacity Development of Management for Sustainable Water Related Infrastructure of Bangladesh under JICA/BWDB. | JICA | BWDB/ IDEA Consultants Inc. | – | 2.00 billion | Jun.’14-Aug. ‘15 |
3. | Consultancy Services for the “Development Phase of Rehabilitation Water Management Infrastructure in Bhola District (DWMIB)”, funded by NLEVD International (ORIO 11/BD/21) on behalf of the Government of Netherlands. | NLEVD Intern-ational (ORIO) | BWDB | Royal Haskoning DHV Netherland BV and AGT Group BV (the Netherlands), Tech Force Innovations BV (the Netherlands) IWM, Tiger IT. | € (million): 50.00 | Aug’13-Feb’15 |
4. | Consultancy Services for Improved Water Management in BWDB Schemes (Contract Package No. BWDB/S-1) under Water Management Improvement Project (IDA Credit No. 4359-BD) | IDA | BWDB | SNC-Lavalin Int. Inc. of Canada, AQUA & DevCon of Bangladesh. | 143.50 | Jan’10-June’15 |
5. | Feasibility Study for Integrated Water Management Project of Gungiajuri Haor Area (Main Consultant) | BWDB | BWDB | BETS & DPM | Tk. 186.00 lacs | June’10-June’11 |
6. | Consultancy Services for Estuary Development Programme (EDP) under Dutch Assistance. | Dutch | BWDB | DHV b.V., Haskoning b.v., DEVCON, Kranti, BETS. | 8.60 | Mar’07-Nov’10 |
7. | District Water Resources Assessment (DWRA) under Small Scale Water Resources Development Sector Project-2, ADB Loan No. 1831-BAN (SF) – 2nd assignment. | ADB | LGED | – | Tk. 42,734.00 lacs. | Jul’07-Jun’09 |
8. | Feasibility Studies for Integrated Water Resources Management of Chalan Beel Area including Beel Halti Development Project | BWDB | BWDB | BETS, Kranti, DPM | 54.06 | Mar’06-Aug’07 |
9. | Emergency Flood Damage Rehabilitation Project – Design and Construction Supervision Consultants (Part D: Water Resources) | ADB | BWDB | DHV, RPMC, DPM, DEVCON | Tk. 7310.14 Lacs | Jan’05-Aug’07 |
10. | District Water Resources Assessment (DWRA) under Small Scale Water Resources Development Sector Project-2, ADB Loan No. 1831-BAN (SF) – 1st assignment. | ADB | LGED | – | Tk. 42,734.00 lacs. | Apr’04- Jun’07 |
11. | Southwest Area Integrated Water Resources Management Project, BWDB ADB TA 4079 BAN: Project Identification and Feasibility Studies | ADB | BWDB | Halcrow Group Ltd., UK, DHI Water & Environment, Halcrow Bangladesh Ltd. and Kranti Associates Ltd. | Tk. 26,025.00 lacs. | Sep’03-Dec’04 |
12. | South-West Flood Damage Rehabilitation Project (Part-D: Water Management and Drainage Facilities) | ADB | BWDB | – | 13.05 | Feb.’01-Jun’04 |
13. | Feasibility Study and Detailed Design of Subprojects under Second Small Scale Water Resources Development Sector Project, ADB Loan No. 1831-BAN (SF)/TA NO:3683-BAN | ADB | LGED | – | Tk. 41,418.00 Lacs. | Jan’03-Dec’06 |
14. | Feasibility Study for a Comprehensive Study for Drainage and Flood Management for Manu-Dhalai-Kushiyara-Khowai System. | BWDB | BWDB | Development Design Consultants Ltd. | Tk. 131.00 Lacs | Sep.’01- Jun.’03 |
15. | Options for the Ganges Dependent Area (OGDA) | IDA | WARPO | Halcrow (UK), MottMacDonald (UK), DHI (Denmark), NRCE (USA), BETS (BD), Proshika & Asso. (NGOs) | 0.02 | Sep.’00-Jun.’02 |
16. | Rehabilitation of Damaged Soft Protection and Installation of Hard Protection at Gazaria under Kalni-Kushiyara River Management Project | CIDA | CHC | – | Tk. 137.20 Lacs | Jun’01–Jun.02 |
17. | Jamuna-Meghna River Erosion Mitigation Project | ADB | BWDB | Halcrow | Tk. 35,580.00 lacs. | Nov’01–May.’02 |
18. | National Water Management Plan (NWMP) | IDA | WARPO | Halcrow, Mott. MacDonald, DHI, NRCE, BETS, HCL, ECA, Proshika, and ASOD, Bangladesh | Tk. 4,229.00 lacs. | Mar.’98-Feb.’02 |
19. | Secondary Towns Integrated Flood Protection Project, Detailed Engineering Design and Construction Supervision | ADB | BWDB | Halcrow, UK. | Tk. 28,919.64 Lacs | Apr.’94-Jun.’02 |
20. | Feasibility Study for Comprehensive South Comilla and North Noakhali Drainage Project | BWDB | BWDB | ACE | Tk. 200.00 Lacs | Nov’00-Oct’01 |
21. | Feasibility Study for Dekar Haor Flood Control and Drainage Project (Modified) Including of Improvement of Drainage System of Derai-Jagannath Area | BWDB | BWDB | ECBL | Tk. 69.77 Lacs. | Jun.’00-Nov.’00 |
22. | River Bank Protection Project | IDA | BWDB | Halcrow, UK. | Tk. 7,127.60 million | Jan’96-Aug’00 |
23. | Public Consensus Process (PCP) for Kalni-Kushiyara River Management Project | CIDA/ ADB | WARPO | – | 39.56 | Feb.’00-Jul.’00 |
24. | Updating Feasibility for Kalni-Kushiyara River Management Project : PPTA-ADB – TA No. 3267-BAN. | ADB | WARPO | Hydrosult Inc., Canada. | Tk. 27,880.00 lacs. | Feb.’00-Jul.’00 |
25. | North-East Regional Water Management Project (FAP-6) | CIDA | BWDB/ WARPO |
NWHC (Canada) SNC-Lavalin Inc. (Canada) BETS (B.Desh) |
Canadian $ 21.3million | Sep’89-Jan.’00 |
26. | Water Sector Improvement Project | WB | BWDB | – | Tk. 300.00 Lacs | Sep.’97-Aug.’99 |
27. | Feasibility Study for Dekar Haor Flood Control and Drainage (FCD) Project | BWDB | BWDB | ECBL | Tk. 49.00 Lacs | Mar.’99-Sep.’99 |
28. | Feasibility Study of Dampara Water Management Project – (FCDI Components) under North-East Regional Water Management Project | CIDA | WARPO |
NWHC (Canada) SNC-Lavalin Inc. (Canada) BETS (B.Desh) |
Apr.’93-Dec.’97 | |
29. | Second Bhola Irrigation Project (Detailed Design & Implementation Plan, ADB Loan No.1159-BAN) | ADB | BWDB | Sir M.MacDonald & Partners Ltd. UK., DDC, Kranti Associates Ltd. (Bangladesh) | BDT 1,779.227 million | Mar.’94-Oct.’97 |
30. | Jamalpur Priority Project (FAP 3.1) Phase II (Peoples Consultation, EIA and Project Refinement-Firm Tranche | EEC | FPCO/ BWDB | Sorgrea (France), Halcrow (UK), AQUA Consultants (Bangladesh) | 59.33 | Jun.’94-Jun.’97 |
31. | Matamuhuri Irrigation Project, Feasibility Study/Survey | BWDB | BWDB | – | 20.62 | Oct.’95-Mar.’96 |
32. | Implementation of Minor Irrigation Component of IFAD Assisted Special Project | IFAD | LGED | – | 78,711.00 lacs. | Sep.’92-Dec.’95 |
33. | Brahmaputra River Training Study (BRTS, FAP-1), Follow up Study | IDA | BWDB | Sir William Halcrow & Partners Consultants | – | Oct.’93-Jul.’94 |
34. | Command Area Development Project | ADB | BWDB | – | BDT 21,605.00 Lacs | Oct.’93-Apr.’94 |
35. | Advisory Services for Review of the Design of Silt Trap and Desiltation of Teesta Barrage | BWDB | BWDB | – | BDT 70,980.00 lacs. | Nov.’93-Mar.’94 |
36. | Ganges Kobadak Irrigation Rehabilitation Project, Phase-II | ADB/ UNDP | BWDB | Hydraulic Research Willinfort U.K | 62.50 | May’91-Jun.’94 |
37. | Jamalpur Priority Project (FAP‑3.1), Phase I | EEC | FPCO/ BWDB | Sogreah,Lahmeyer, Halcrow | Jul.’91-Feb.’93 | |
38. | South-West Area Water Resources Management Project (FAP-4, TA No. 1498‑BAN) | ADB | FPCO/ BWDB | Sir William Halcrow & Partners Ltd.,Danish hydraulic Ins. | BDT 588.00 lacs. | Oct.’91-May’93 |
39. | Brahmaputra River Training Study, FAP-1 (Cr. No. 1870-BD), Feasibility Study | IDA | BWDB | Sir William Halcrow & Partners Ltd.,Danish hydraulic Ins. | Mar.’90-Feb.’93 | |
40. | Secondary Towns Integrated Flood Protection Project, Bridging Consultancy for Detailed Design | ADB/ WB | BWDB | Sir William Halcrow and Partners Ltd | BDT 26,249 lacs | Jul.’92-Jan.’93 |
41. | Secondary Towns Integrated Flood Protection Project (FAP-9A, TA No. 1396-BAN), Feasibility Study | ADB | FPCO/ BWDB | Sir William Halcrow and Partners Ltd. (Lead Firm) | May’91-Mar.’92 | |
42. | Greater Dhaka City Integrated Flood Protection Project, Feasibility Study (FAP-8A) | JICA | FPCO/ BWDB | Pacific Consultants International, Japan | Oct.’90-Mar.’92 | |
43. | Third Flood Control and Drainage Project, FCD-III (BGD/85/029) | IDA | BWDB |
Sir William Halcrow and Partners Ltd.UK, Resources Development Consultants, Sri Lanka |
65.00 | Jun.’86-May’92 |
44. | BWDB Small Schemes Project (SSFCDI, IDA Financed) | IDA | BWDB | Sir William Halcrow,& Partners Ltd. and RDC | 54.00 | Apr.’85-Dec.’92 |
45. | Halda Irrigation Extension Project (Under SSFCDI Project, IDA Financed) | IDA | BWDB | – | BDT 19,385.00 lacs. | Jul’91-Dec’92 |
46. | Second Pabna Irrigation and Rural Development Project | ADB | BWDB | Mott Macdonald & Partners Ltd.(U.K) | BDT 27,290.00 lacs. | Apr’91-Sep’91 |
47. | Greater Dhaka City Protection, Flood Inundation Study Project (FAP-8A), Phase-I | JICA | BWDB | Pacific Consultants International, Japan | Nov’90-Mar’91 | |
48. | National Water Plan Project, Phase-II (BGD/85/076) | UNDP | BWDB | Harza Engineering(USA) and Mott Macdonald & Partners Ltd. | BDT 1440.00 Lacs | Dec’88-Jun’91 |
49. | System Rehabilitation Project (BGD/84/010), 21 Sub-projects | UNDP/WB | BWDB | Harza Engineering(USA) and Mott Macdonald & Partners Ltd. | 100.00 | Jun’86-Nov’89 |
50. | Haor Development Project (Phase-I) | CIDA/ UNDTCD/ WB | BWDB | SLI/NHC | May’89-Aug’89 | |
51. | Small Scale Flood Control, Drainage and Irrigation (SSFCDI) Project, Phase-III (IFAD Financed) | IFAD | BWDB | Resources Development Cons.Sri Lanka | 11.40 | Aug’84-Jul’88 |
52. | Chenchuri Beel Irrigation Project (Under SSFCDI, IDA Financed) | IDA | BWDB | Sir William Halcrow and Partners,U.K | BDT 26.00 lacs. | Jan’86-Oct’86 |
53. | Flood Damage Repair Estimate, 1984 Flood | WB | – | Dec’85-Dec’85 | ||
54. | BWDB System Rehabilitation Project (UNDTCD/World Bank), Feasibility Study | UNDP/WB | BWDB | Harza Engg. Company International(USA) | Feb’84-Oct’84 | |
55. | Small Scale Flood Control, Drainage Irrigation (SSFCDI) Project, Phase-II (IFAD Financed) | IFAD | BWDB |
Resources Development Consultants, Sri Lanka |
14.00 | Apr’83-Feb’84 |
56. | Two Beels Drainage Project (Boalmari and Baliakandi Thanas under Faridpur District) | LGED | – | BDT 21.41 lacs. | Feb’83-Jun’83 | |
57. | Special Study on Barisal Irrigation Project | WB | BWDB | – | BDT 2,572.45 lacs. | Oct’83-Dec’83 |
58. | Small Scale Flood Control, Drainage and Irrigation (SSFCDI) Project, Phase‑I (IFAD Financed) | IFAD | BWDB | – | BDT 3,734.00 lacs. | Mar’82-Sep’82 |
- ROAD, BRIDGE, CULVERT AND RURAL INFRASTRUCTURE DEVELOPMENT
Sl. No. | Project Name | Client | Associate Consultant |
Project Cost (mil USD) |
Project Period |
|
Funding Agency | Exec. Agency | |||||
1. | In-depth Monitoring Study of the Project titled “Greater Dhaka Sustainable Urban Transport Project (BRT Gazipur-Airport)” | GOB | IMED | DECL | Mar’20-Jun’20 | |
2. | Consultancy Services for carrying out Feasibility Study and Preliminary Design of Flyover at Begumgonj Intersection to Chowmuhani Bazar ( 33rd to 36th km) of Feni-Noakhali National Highway (N-104) under Noakhali Road Division of RHD. | RHD | RHD | Engineering Science Ltd. (ESL) |
Jan’18- Jul’18 |
|
3. | Consultancy Services for Hydrological and Morphological Study of 14 Bridges over Different River at Kishoreganj, Mymensingh, Jamalpur, Rajbari, Kushtia, Narayanganj, Tangail, and Gazipur Districts (Package No. CIB-S-58) | LGED | LGED | S&F | 490.845 |
Sep’17- Jun’18 |
4. | Consultancy Services for Hydrological and Morphological Study of 14 Bridges over Different River at Naogaon, Dinajpur, Lalmonirhat, Pabna, Natore, Comilla , Feni, Chittagong, and Cox ‘s Bazar Districts (Package No. CIB-S-60) | LGED | LGED | S&F | 490.845 |
Sep’17- Jun’18 |
5. | Consultancy Services for Hydrological and Morphological Study and Environmental Impact Assessment (EIA) for Construction of 120.00m Long RCC Bridge on Achintapur UP H/Q – Bhalukapur Bazar Road over Jalburunga River under Gouripur Upazila, Dist. Mymensingh. | LGED | LGED | S&F | 2.00 | Oct.16-Nov.16 |
6. | Consultancy Services for Supervision of 11 (Eleven) Nos. Bridges Construction Work of Purbachal New Town Project | RAJUK | RAJUK | SARM | 1066.67 | Jan’13-Apr’16 |
7. | Providing Consultancy Services for Detailed Design, Supervision and Monitoring for the Construction of Road, Bridges and Culverts of Extension of Madani Avenue (from Progoti Sarani Intersection to Balu River). | RAJUK | RAJUK | SARM-EPC | 32.16 | Jun’11-Feb’15 |
8. | Consultancy Services for Sub-soil investigation, structural Design, Estimate & Supervision for Bridge/Culvert under Union Infrastructure Development Project (Khulna, Bagerhat & Satkhira district) Project. | LGED | LGED | EPC-ESL | 39.84 | Mar’11- Feb’14 |
9. | Consulting Services for Supervision of 7 Nos. of Bridge Construction Work of Purbachal New Town Project. | RAJUK | RAJUK | SARM, BETS | 49.56 | Dec’09-Jun’11 |
10. | Construction of 3 Numbers of Bridges 1 in Sonargaon Janapath in between 1st and 2nd Phase across the existing lake, and rest of the 2 bridges over the lake in Uttara 3rd Phase. | RAJUK | RAJUK | – | 304.72 | Jun’06-Feb’14 |
11. | Consultancy Services for Feasibility Study and Conceptual Design for the Construction of Flyover from Paltan to Dhaka-Mawa Road via 4th (New) Bridge Over Buriganga River | RAJUK | RAJUK | Devcon-EPC | Mar’11-Mar’ 14 | |
12. | Consultancy Services for Preparation of Detail Structural Design, Estimate, Technical Specification and Standard Tender Document of 02 (Two) Bridges under Manikgonj District under Feasibility Study in Terms of Hydrological and Morphological Study, Environmental Impact Assessment (EIA) including Topographical Survey & Design of Important 02 (Two) Bridges under Manikganj District | GoB | LGED | SARM | 0.06 | Oct’13-Dec’13 |
13. | Technical Assistance (Design & Supervision; Market & Institutional Development; Gender & Sociology; Monitoring & Evaluation; NGO Coordination & Training) to MIDPCR | IFAD | LGED | ESL and BETS | 43.29 | Feb’08-Jun’13 |
14. | Detailed Design, Supervision and Monitoring for the Construction of Roads, Bridges/Culverts of Purbachal Link Road (Debogram – Progoti Soroni connecting Road) | RAJUK | RAJUK | SARM and DatEx | 48.31 or BDT 3,816.50 million | Mar’09- Nov’12 |
15. | Design, Supervision and Institutional Support Consultancy Services for Eastern Bangladesh Rural Infrastructure Development Project (EBRIDP). | JBIC | LGED | WSP Inc. Katahira, DEVCON, & DIVINE Bangladesh. | 142.00 or BDT 9,949.00 million | May’06-June’11 |
16. | Consultancy Services for Design of a Bridge Over Channel-2 in Modhumoti Model Town at Aminbazar, Dhaka | Metro Makers & Developers Ltd. | Metro Makers & Developers Ltd. | – | Jan’10-Jul’10 | |
17. | Conducting Detailed Design for Railway Overpass and Road connecting between Bijoy Sarani and Tejgaon Industrial Area, Dhaka | RAJUK | RAJUK | SARM | 16.63 | Mar’08-Apr’10 |
18. | Consultancy Services for Design, Supervision & Monitoring, Contract Package‑S1, (North Western & Central Parts) under Rural Transport Improvement Project (RTIP) of RDP-26. | IDA | LGED | Hifab, DHV, RPMC |
255.00 or BDT 24,462.50 million |
Jan.’04-Mar’09 |
19. | Feasibility Study and Detailed Engineering of Dhaka-Chittagong 4-Lane Access Controlled Highway [ADB Loan No. 1789-BAN(SF)]. | ADB | RHD | SNC-LAVALIN Int. Inc., Canada. SAI., India. PUL and KPL-Bangladesh. | BDT 16.72 crore | Dec’06-Dec’08 |
20. | Greater Noakhali and Chittagong District Feeder Road Project | IDB | LGED | DEVCONsultants Ltd. | BDT 2,768.80 million | Sep’04-Jun’08 |
21. | Study on Aid Effectiveness in the Infrastructure Sector, Bangladesh. | JBIC | JBIC | – | 0.02 | Feb’08-Apr’08 |
22. | Assistance in Local Level Development through Coordination & Participatory Planning and Better Functioning of Union Parishad Complex as one Stop Service Centre constructed under Services of Greater Faridpur Rural Infrastructure Development Project (RD‑24). | JBIC | LGED | WSP Inc., UK., DHV-Netherlands, EPC & DEVCON. | 84.23 or BTD 4,759.22 million | Jul.’06-Jun.’07 |
23. | Design Supervision, Implementation Monitoring and Institutional Strengthening for Effective Evaluation & Monitoring of Greater Faridpur Rural Infrastructure Development Project (GFRIDP/RDP‑24). | JBIC | LGED | WSP Inc., UK., DHV-Netherlands. EPC & DEVCON. | BDT 4,759.22 million | Jul.’06-Jun.’07 |
24. | Greater Faridpur Rural Infrastructure Development Project, RDP-24 (D&S Consultancy Services) | JBIC | LGED | WSP Int. (UK), DHV Int. , The Netherlands, DEVCON & ECA, BD. | BDT 4,759.22 million | Jul’02-Jun’06 |
25. | Improvement of Feeder Road Type-A under Third Road Rehabilitation and Maintenance Project RRMP‑III | IDA | RHD |
ICT Pvt. Ltd. (India) Sverdrup Civil Inc. (USA) ESL (BD) PUL (BD) |
115.55 | May’99-Jun’05 |
26. | Design and Supervision of Sylhet Feeder Road Project, Phase-IV | IDB | LGED | – | BDT 1,574.00 Lacs. | Sep’01-Mar’05 |
27. | Third Rural Infrastructure Development Project, RDP-21 (Phase-I&II) | ADB | LGED | Hifab, OSG, MML, JOC, DDC, RPMC | BDT 83,284.00 Lacs. | Jan’99-Jan’05 |
28. | Road Network Improvement and Maintenance Project, TA No. 3508, RHD-ADB | ADB | RHD | Louis Burger (U.S.A.), Bangladesh Consultants Ltd. (BD) | BDT 108,615.30 lacs. | Jun’01-Dec’01 |
29. | Construction of Feeder Road Project in North-East Region of Bangladesh (Phase-III) | IDB | LGED | None | BDT 1,574.00 million | Jan’98-Dec’00 |
30. | Infrastructure Greater Sylhet District, RDP-3, Phase.-I, II, & III. | IDB | LGED | – | BDT 1,574.00 million | Apr’92-Nov’00 |
31. | Designed 160 metre long one Balanced Cantilever RCC Bridge over Old Brahmaputra River in Belabo Thana under Narshingdi District. | LGED | LGED | – | BDT 179.77 Lacs. | 1998-2000 |
32. | Infrastructure in Greater Khulna, Jessore and Kushtia, RD-18. | ADB | LGED | HIFAB, SMEC, BECA Warley | BDT 47,066.00 Lacs. | Sep’93-Jun’00 |
33. | Project Management Consultancy of Bangabandhu (Jamuna) Multipurpose Bridge Project. | IDA, ADB, OECF | JMBA |
Price Water House, UK Sir William Halcrow & Partners Ltd. UK. Rahman & Rahman Huq, BD |
905.45 | Sep’94-Jun’98 |
34. | Sheikh Mujib Road Culvert | UNCHS | CCC | – | BDT 178.00 lacs. | Feb’94-Jun’97 |
35. | Third Flood Rehabilitation Project in 37 Districts and 52 Pourashavas | IDA | LGED | RDC (Sri Lanka) | 24.80 | Dec’89-Dec’93 |
36. | Rural Roads and Market Improvement and Maintenance Project in 29 District and 41 Pourashavas | IDA | LGED | Resources Development Consultants Ltd. (Sri Lanka) | 10.40 | Jul’89-Jun’93 |
37. | Consultancy for construction of Bridges and Culverts | USAID | DRR | – | BDT 4,880.00 lacs. | Aug’88-Apr’90 |
38. | Second Flood Damage Rehabilitation Project | WB | LGED | – | 25.00 | Jul’87-Jun’89 |
39. | Flood Damage Rehabilitation Project (Inventory) | IDA | LGED | – | BDT 2,926.00 lacs. | Aug’87-Sep’87 |
40. | Flood Damage Rehabilitation Project, Phase-I | IDA | LGED | Resources Development Consultants Ltd. (Sri Lanka) | 8.29 | Jul’85-Jun’87 |
41. | Road Rehabilitation and Maintenance Project, Phase‑II (Under RHD) | IDA | RHD | Snoy Mountains Engg. Corporation, Australia | BDT 50,196.00 lacs. | Apr’86-Jun’87 |
42. | Rehabilitation/Reconstruction of Structures (Bridges and Culverts) in 7 Districts | IRWP | Norway Tech. Asstt. | MacDonald & Partners Ltd. | Jul’85-Mar’86 | |
43. | Road Rehabilitation and Maintenance Project, Phase-I | IDA | RHD | Snowy Mountains Engg. Corporation, Australia | Jul’85-Mar’86 | |
44. | Rural Road Project (Feasibility Study) | LGED | – | Jun’84-Dec’84 | ||
45. | Rural Development Project, Phase-II, LGRD (Loan No. 524-BAN-SF). | ADB | LGRD | – | Mar’82-Jul’83 | |
46. | Feasibility Study of Two Thanas namely, Iswarganj and Nandail thanas under the Intensive Rural Works Project, Phase-I | NCRDIC | LGRDC | – | BDT 245.52 million | 1979-1981 |
- URBAN AND MUNICIPAL DEVELOPMENT, PHYSICAL PLANNING
Sl. No. | Project | Client | Associate Consultant |
Project Cost (mil USD) |
Project Period | |
Funding Agency | Exec. Agency | |||||
1. | Preparation of Master Plan for Rangpur Divisional Town under District Towns Infrastructure Development Project | GoB | LGED | Data Experts, Ehsan Khan Architects Ltd. | 0.52 or BDT 36.28 million | Aug’11-June’14 |
2. | Management & Supervision Consultancy (Pack S2) for Municipal Services Project, Phase-II (MSP-II), IDA Cr. No. 4761-BD under Bangladesh Municipal Development Fund (BMDF) | IDA | BMDF | Aqua, Hifab, RPMC, EPC | Apr’11-Sep’12 | |
3. | Technical Assistance (TA) for Extended Municipal Capacity Building Program and Preparation of Municipal Services Project-II : Preparing Frameworks for Municipal Development Interventions (IDA 4761). | IDA | LGED | MottMacDonalds | BDT 280.70 million | Oct’11-Apr’12 |
4. | Preparing Structure Plan, Master Plan, and Detailed Area Plan for the extension of the Khulna Master Plan Area Upto Mongla Town. | KDA | KDA | Sheltech Consultants (Pvt.) Ltd. | 0.85 | Apr’07-Dec’11 |
5. | Design & Supervision Consultancy Services for Emergency 2007 Flood Restoration and Recovery Assistance Program (Municipal Services Project – Contract No. S‑275) | IDA | LGED | AQUA | 122.76 | Jun’08-Jun’10 |
6. | Preparation of Structure Plan, Master Plan and Detailed Area Plan for Barisal Divisional Town. | UDD | UDD | Sheltech Consultants (Pvt.) Ltd. | BDT 552.00 lacs. | Jul.’06-Jun’10 |
7. | Preparation of Structure Plan, Master Plan and Detailed Area Plan for Sylhet Divisional Town. | UDD | UDD | Sheltech Consultants (Pvt.) Ltd. | BDT 552.00 lacs. | Jul.’06-Jun’10 |
8. | Preparation of Detailed Area Plan (DAP) for Dhaka Metropolitan Development Plan (DMDP) under RAJUK (Group-D). | RAJUK | RAJUK | Data Experts (P) Ltd. | 0.08 | Aug’05-Jun’10 |
9. | Preparation of Detailed Area Plan (Group-B) for Dhaka Metropolitan Development Plan (DMDP) under RAJUK. | RAJUK | RAJUK | Data Experts (P) Ltd. | 0.57 |
Aug’04-Jun’10
|
10. | Planning and Designing of Various Infrastructural and Utility Plans and Components with Ancillary Works for Purbachal New Town Project. | RAJUK | RAJUK | SARM, BETS | 485.00 Or BDT 33,110.00 million | Jun’06-Oct’08 |
11. | Design & Supervision Consulting Services for 2004 FDRP (Urban Sector under MSP), IDA Credit No. 3177-BD. | IDA | LGED | AQUA Consultants Ltd. | BDT 1,667.11 million | Apr.’05-Jun.’07 |
12. | Municipal Services Project (Design, Supervision and Monitoring Consultancy Services) | WB | LGED |
Louis Berger (USA), Halcrow UK Ltd AQUA |
BDT 6,751.80 million | Dec’99-Feb’05 |
13. | Urban Governance and Infrastructure Improvement Project | ADB | LGED | DHV, The Netherlands | Nov’01-Jun’02 | |
14. | Municipal Services Project | IDA | LGED | Mott MacDonald Limited (UK), Aqua Consultant and Associated Ltd. | BDT 608.00 lacs. | Apr’94-Aug’98 |
15. | Preparation of Structure Plan, Master Plan and Detail Area Plan for Dhaka City | UNCHS (HABITAT) | RAJUK |
Mott MacDonald International Ltd. Culpin Planning Limited (U.K.) Dev. Adm. Group (University of Birmingham, U.K.) AIT, Consociate Ltd. (Dhaka) |
BDT 1,549.00 lacs. | Apr’92-Jul’96 |
16. | Support for Urban Management and Municipal Services Programmes, Dhaka City |
UNCHS (Habitat) |
DCC |
Sir M.Mott MacDonald International Ltd. Culpin Planning Limited (U.K.) |
24.84 | Jun’90-May’94 |
17. | Support for Urban Management and Municipal Services Programmes, Chittagong City |
UNCHS (Habitat) |
CCC |
Sir M.Mott MacDonald International Ltd. (U.K.) Culpin Planning Limited (U.K.) |
24.84 | Jun’90-May’94 |
18. | Reconstruction of Rural Houses in Flood affected areas all over Bangladesh | UNCHS/ UNDP | DOXIADIS ASSOCIATES, GREECE | Jul’91-Dec’93 | ||
19. | Secondary Towns Infrastructure Development Project-II, T.A. No. 1466-BAN | ADB | LGED | Gherzi Eastern Limited, Bombay | BDT 36,400.00 lacs. | Nov’92-Sep’93 |
20. | Landuse/Master Plan of Bandarban Pourashava | UDD | UDD | – | 1989-1991 | |
21. | Landuse/Master Plan of Ramu and Rowangchari Upazilas (Presently Thanas) | UDD | UDD | – | 1989-1991 | |
22. | Landuse/Master Plan for Perojpur Pourashava | UDD | UDD | – | 1989-1990 | |
23. | Landuse/Master Plan for Babuganj, Swarupkati and Rajapur Upazilas (Presently Thanas) | UDD | UDD | – | 1985-1988 | |
24. | Master Plan for Jhenaidah Pourashava | UNCHS | UDD | – | Sep’85-Sep’86 | |
25. | Landuse/Master Plan of Muladi, Hizla and Mehendiganj Upazilas (Presently Thanas) | UDD | UDD | – | 1983-1984 |
- ARCHITECTURAL & CIVIL ENGINEERING PROJECTS
Sl. No. | Project | Client | Associate Consultant |
Project Cost (mil USD) |
Project Period |
|
Funding Agency | Exec. Agency | |||||
1. | Consultancy Services for Contract Management, Design and Construction Supervision of 10 Number School cum Cyclone Shelters for the victims of Cyclone SIDR under Fael Khair Program Bangladesh-(Package‑9) Project No. BD1-0027 | IDB | LGED | – | 130.00 | Mar’14-Apr’18 |
2. | Consultancy Services for Contract Management, Design and Construction Supervision of 9 Number School cum Cyclone Shelters for the victims of Cyclone SIDR under Fael Khair Program Bangladesh- (Package-10) Project No. BD1-0027 | IDB | LGED | – | 130.00 | Mar’14-Dec’17 |
3. | Consultancy Services for Contract Management, Design and Construction Supervision of 39 Number of School cum Cyclone Shelters for the victims of Cyclone SIDR under Fael Khair Program Bangladesh- (Package-3, 4 & 5) Project No. BD1-20. | IDB | LGED | – | 130.00 | Sep’12-May’17 |
4. | Construction of DCC Market in Sutrapur Area of Ward No. 80. | DCC | DCC | – | Oct’05-May’17 | |
5. |
Consultancy Services for Preparation of Architectural and Structural Design including Sanitary, Plumbing, Electrical and Estimation and Preparation of Tender Documents for Construction of (a) 15 (Fifteen) Storied and (b) 7 (seven) storied (with 2 Basement) Office cum Commercial Building for Tongi Bhaban at Tongi, Gazipur City Corporation, Gazipur. |
GCC | GCC | – | 12.20 |
Jun.’15- Jun.’16 |
6. | Engineering Management Consultancy (EMC) for Construction of Server Stations for Electoral Database (CSSED) | UNDP | LGED/ UNDP/ PWD | RDC, Sri Lanka. | Dec.’13-Dec.’14 | |
7. | Engineering Services for Implementation of Pilot Project – Financial Assistance towards Islamic Educational Institution and Orphanage in Bangladesh. | IDB-BISEW | IDB | – | 1.62 | Aug’05-Feb’14 |
8. | Construction of Upazila and Regional Server Stations for Electoral Database (CSSED) Project | GoB & UNDP | NEC, Secretariat | – | BDT 35,591.00 Lacs. | Mar’12-May’13 |
9. |
Consultancy Services for Fael Khair School cum Cyclone Shelter Program for the victims of Cyclone SIDR – Site Survey and Selection, Soil Investigations, Detailed Design, Preparation of Tender Documents |
IDB | LGED | – | 130.00 | May’09- May’13 |
10. | Construction of 10 storied Community Center cum Super Market at Narayanganj. | Narayan-ganj Poura-shava | Narayan-ganj Poura-shava | – | Taka in Crore: 80.00 |
Jun’07-Feb’08
|
11. | Consultancy Services for Construction of Six storied Tan Bazar Park Super Market at Tan Bazar beside SA Maleh Road, Narayanganj | Narayan-ganj Poura-shava | Naraya-ganj Poura-shava | – | 2.46 | Oct’05-Feb’08 |
12. | Construction of 2800 Core Shelters for SIDR Affected Coastal Areas of Bangladesh | Govt. of India | Indian High Commi-ssion | CES, India | Aug’08-Dec’11 | |
13. | Planning, Design & Construction Supervision for Out Patient Department (OPD) at Uttar Khan, Dhaka. | MHWT | MHWT | – | Jun’09-ongoing | |
14. | Consultancy Services for Extension of Kalabhaban for Department of Theatre and Music, Dhaka University. | Govt. of India | Indian High Commission | CES, India | BDT 22.86 million | Feb’09-Dec’11 |
15. | Design and Fabrication of Rath at Dhamrai | Govt. of India | Indian High Commission | CES, India | BDT 7.86 million | Aug’08-Jul’10 |
16. | Construction of Second Academic Building for Islamic University of Technology under IDB Assistance (BD-131) | IUT/ IDB | IUT | – | 3.764 | Jun.’05-Jun’10 |
17. | Feasibility Study of 20-Storied Commercial Building at Agargaon Administrative Area, Dhaka. | IDB-BISEW | IDB | – | Apr’07-Sep’07 | |
18. | Extension and Development of Tourism through Development of Land full of Natural Beauty and having Diversified Culture in Hill Tracts. | CHTDB | CHTDB | – | Jun.’06-Sep.’07 | |
19. | Feasibility Study for Construction of One New ICD near Dhirasram Railway Station in Gazipur District under the proposed Export Infrastructure Development Project (IDA Grant # H-107 BD) | IDA | CPA/ BR | CES (India) Pvt. Ltd. | Aug’06-Jun’’07 | |
20. | 100 Bedded Mujibur Rahman Memorial Diabetic Hospital at Kushtia. | DAB | DAB | – | Feb’03-Aug’05 | |
21. | Extension and Development of Sylhet Railway Station | BR | BR | BDT 1,460.00 lacs. | Apr’98-Jan’04 | |
22. | 16-Storied Commercial Building (Sattara Centre) at Naya Paltan, Dhaka | Mr. Abdus Sattar | Mr. Abdus Sattar | – | Sep’96-Nov’03 | |
23. | Construction of 6-storied building having Indoor Swimming Pool cum Multipurpose hall, Lamda Hall and Auditorium over existing pool complex of Gulshan Club Ltd. | GCL | GCL | – | Jul’01-Sep’03 | |
24. | Construction of Quarter for Professors and the Equivalent Personnel of Khulna University | KU, Khulna | KU, Khulna | – | Apr’00-Dec’02 | |
25. | Consultancy Services for Construction of 20-storied Corporate Building of AB Bank Ltd., 82 Kakrail, Dhaka. | AB Bank Ltd. | AB Bank Ltd. | Architekton Pvt. Ltd. | Jun’99-Jun’02 | |
26. | 25 Bed Diabetic Hospital at Jhenaidah, Jessore, Sylhet, Faridpur,Bogra, Narsingdi &Feni | DAB | DAB | – | BDT 15.23 million | Sep’96-Dec’01 |
27. | Development of Tourism Facilities at Shatnal | BPC | BPC | – | Sep’99-Dec’01 | |
28. | Repair/Renovation of Clinic Buildings and Construction of Staff Quarters in 18 MCWCs (4th Phase) | UNFPA | UNFPA/ DFP | – | Dec’97-May’01 | |
29. | Medical College for Women and Hospital at Uttara, Dhaka. | MHWT | MHWT | – | BDT 15.00 million | Jun’96-Mar’00 |
30. | 20-Storied Factory Building of Woodland Apparels Ltd. at Mirpur, Dhaka, constructed upto 12 floors in 1st Phase. | Woodland Apparels Ltd. | Woodland Apparels Ltd. | – | Jul’96-Dec’99 | |
31. | Further Development of Rajshahi District Stadium | NSC | NSC | – | BDT 307.00 lacs. | Jun’98-Jun’99 |
32. | Construction of 10-Storied Out Patient, Diagnostic, Administrative Department (Block-A) at Uttar Khan. | MHWT | MHWT | – |
Dec’97-Nov’98 Design Completed. |
|
33. | 6-Storied Indoor Swimming Pool Plus Multipurpose space for Gulshan Club (Constructed upto 1st Floor) | GCL | GCL | – | BDT 1.50 million | Nov’96-Sep’98 |
34. | Needs Assessment of upgrading of 19 MCWCs and production of Design Drawing – 2nd Phase (Ref. BGD/91/P02) | UNFPA | UNFPA/ DFP | – | Dec’96-Jun’98 | |
35. | Construction of Inland Container Depot (ICD) for Bangladesh Railway at Kamalapur, Dhaka. | BR | BR | – | BDT 8,400.00 lacs. | Feb’97-Dec’97 |
36. | Feasibility Study for a Proposed Container Yard at Chittagong. | Maersk BD; Wal Carlbro; Int. Inc. | “K” Line (BD) | – | Feb’97-Mar’97 | |
37. | Hotel Saint Martin (9 storied) at Agrabad, Chittagong | Hotel Saint Martin Ltd. | Hotel Saint Martin Ltd. | – | BDT 7.00 million | Aug’91-Nov’97 |
38. | Works at the Institute of Forestry, Chittagong University under Forest Resources Management Project | IDA | Institute of Forestry | – | BDT 1,6133.03 Lacs | Aug’94-Feb’96 |
39. | Works under Fisheries Training and Research Project (Bangladesh Agriculture University, Mymensingh) | BAU | BAU | – | BDT 2.02 million | May’95-Jan’96 |
40. | Construction of Seed Pathology Laboratory under Plant Pathology Department | BAU | BAU | – | BDT 30.00 Lacs. | Feb’95-Jun’95 |
41. | Preparation of Master Plan for Housing Complex of Bangladesh Railway in East Zone | BR (East Zone) | BR (East Zone) | – | Jan’95-Jun’95 | |
42. | Various Development Works of National Botanic Garden, Mirpur, Dhaka | MEF | MEF | – | BDT 1.20 million | Feb’91-Jun’95 |
43. | Remodelling of Chittagong Railway Station and Preparation of Master Plan for Beautification and Commercial & Residential Use of land near Chittagong Railway Station | BR (East Zone) | BR (East Zone) | – | Feb’95-Apr’95 | |
44. | Modernization of Dhaka Railway Station at Kamalapur and Preparation of Master Plan | BR (East Zone) | BR (East Zone) | – | Dec’94-Apr’95 | |
45. | Master Plan to Assess the Need of Rehabilitation and Maintenance of Existing Food Godowns and Construction of New Godowns Upto the year 2000 A.D. | MOF | MOF | – | Jun’92-Jun’93 | |
46. | Galco Steel Mills, Narayanganj, Dhaka | Galco Steel Limited, INDIA | Galco Steel Limited | – | BDT 2.75 million | Jun’88-Dec’91 |
47. | Hotel Saint Martin (10-storied) at Agrabad, Chittagong (Three Star Hotel) | Hotel Saint Martin Ltd. | Hotel Saint Martin Ltd. | – | BDT 12.50 million | Jul’89-Aug’91 |
48. | Union Seed Stores under Extension and Research Project-II, Comilla and Barisal District | MOA | MOA | Prokaushali Sangshad Limited | 1986-1989 | |
49. | Chittagong Urea Fertilizer Project | ADB | Chittagong Urea Fertilizer Ltd. | UNICO, Japan | Jan’84-Sep’89 | |
50. | Design of Naval Jetty, Chittagong | BN | BN | Sthapataya Silpa Ltd. | 1982-1988 | |
51. | Re-Rolling Mills, Dhaka (Jupitar Steel Mills) | Jupitar Steel Mills Ltd. | Jupitar Steel Mills Ltd. | – | 1985-1988 | |
52. | Construction of Fertilizer Storage Godown (CIP-II) at Shambhuganj and Parbatipur | ADB | BADC | – | BDT 500.00 million | 1985-1987 |
53. | Construction of Multi-storied Shopping & Commercial Building Complex, Dhaka (ABC Plaza, a 16- storied Commercial Building at Mohakhali C/A, Dhaka) | M/s. Chowdhury Sons Ltd. | M/s. Chowdhury Sons Ltd. | – | BDT Tk. 350.00 million | 1985-1987 |
54. | Construction of Multi-storied Commercial Building Complex, Dhaka (for H.R. Holdings Ltd. at 15-storied building) | M/s. Karnaphuli Ltd. (H.R. Holding) | M/s. Karnaphuli Ltd. (H.R. Holding) | – | BDT 7.00 million | 1985-1987 |
55. | Textile Mills Upgrading and Renovation at Sohagpur, Narayanganj | Sohagpur Textile Mills Ltd. | Sohagpur Textile Mills Ltd. | – | Jul’86-Nov’87 | |
56. | 24-Storied Multi-purpose Building | M/s. Salena Holding Ltd. | M/s. Salena Holding Ltd. | – | Jul’86-Sep’86 | |
57. | Preparation of Architectural, Structural, Electrical, Sanitary and Water Supply Design and Detailed Drawings and Top Supervision of 6 Storied Building of Chairman of BSCIC at Gulshan, Dhaka. | BSCIC | BSCIC | – | BDT 10.00 Lacs. | 1983-1986 |
58. | Garments Factory at Tongi (Elite Garments) | Elite Garments Industries | Elite Garments Industries | – | BDT 1.75 million | 1983-1985 |
59. | Interior Design of Building of Arab Bangladesh Bank, Chittagong | A.B. Bank | A.B. Bank | – | 1984 | |
60. | Flour Mills at Gazipur (Mymensingh Flour Mills) | Mymen-singh Flour Mills | Mymen-singh Flour Mills | – | BDT 3.00 million | Nov’83-Oct’84 |
61. | Architectural Design, Drawing and Construction Supervision of 11 Storied Bangladesh Medical Association Complex comprising Shopping Counter, BMA Auditorium, Sunday Clinic at Toplhana Road, Dhaka. | BMA | BMA | – | BDT 3.50 Crore | 1979-1983 |
62. | Interior Renovation of Indo-suez Bank at Dhaka and Chittagong | Banque Indosuez | Banque Indosuez | – | – | 1982 |
63. | Consultancy Services for Architectural Design, Structural, Pile Design, Soil Investigation, Electrical Sanitary, Water Supply, Lifts of 7-Storied Office Building of Mr. Mukhlesur Rahman, Owner of Uttara Motors at Chittagong. | Uttara Motors | Uttara Motors | – | BDT 2.25 Crore | 1981-1982 |
- AGRICULTURE, HORTICULTURE, FORESTRY, FISHERIES, SOCIO-ECONOMIC, ENVIRONMENTAL AND RURAL DEVELOPMENT PROJECTS
Sl. No. | Project | Client | Associate Consultant |
Project Cost (mil USD) |
Project Period | |
Funding Agency | Exec. Agency | |||||
1. | Forestry Sector Project | ADB | DoFo | Tecsult (Lead), Canada, SODEV, NRP, HCL of Bangladesh. | BDT 38,900.00 lacs | Jan’98-Jun’03 |
2. | Forest Resources Management Project (Cr. 2397 BD) | WB | DOFo | MADECOR, Philippines | BDT 23,472.00 lacs | Dec’94-Dec’98 |
3. | Horticulture Baseline Production and Marketing Survey | FAO | DAE/ BADC/ BARI | – | Oct’94-Mar’97 | |
4. | Extension and Environmental Impact Monitoring and Evaluation Project | ODA | DAE | ULG Consultants, England | Mar’94-May’94 | |
5. | Project Formulation Survey on Export Possibility of Agricultural Products in Bangladesh | JICA | JICA | – | Oct’92-Sept’93 | |
6. | Bench Mark Re-survey of Women in Development and Environmental Aspects | WB | BWDB | – | Feb’91-Mar’91 | |
7. | Third Fisheries Project (Investigation, Planning, Design) | WB | BWDB | – | BDT 20,798.00 lacs. | Apr’89-Oct’89 |
8. | Ox-Bow Lake Small Scale Fishermen Project (Survey, Planning, Detailed Design, Working Drawings) | IFAD | BWDB | – | BDT 300.00 million | May’87-Jan’88 |
9. | Socio-Economic Bench Mark Survey for Assessment of Impact of Sub-Projects | WB | BWDB | – | Mar’86-Jan’87 | |
10. | Minor Crops Development Project | IFAD | LGED | – | Jan’86-Apr’86 | |
11. | Rangamati Fishery Project (Survey, Planning, Detailed Design, Construction Supervision) | BFDC | BFDC | – | BDT 75.00 Lacs. | Feb’84-Apr’86 |
12. | Study on the Estimation of Productive Capacities (Transport, Industries, Irrigation Equipment, Education and Health Sectors) | PC | PC | – | May’84-Feb’85 | |
13. | 100 Thana Intensive Rural Works Program, Phase‑III (Feasibility Study). | IDA | LGRD/ BWDB | – | Jun’84-Mar’85 | |
14. | Agro-Engineering Study under Rural Roads and Marketing Study. | LGRD | LGRD | – | Mar’84-Sep’84 | |
15. | Market Management Study, Rural Roads and Marketing Project. | LGRD | LGRD | – | Mar’84-Sep’84 | |
16. | Evaluation of the Impact of the New Marketing System for Distribution of Fertilizer in Bangladesh | BADC | BADC | – | Mar’83-Jun’84 | |
17. | Crop Intensification Project (CIP) | ADB | BADC | – | BDT 317.06 lacs. | Apr’84-Dec’84 |
18. | Evaluation of T&V System under ERP-I in North-West Bangladesh | WB | MOA | – | Sep’82-May’84 | |
19. | North Kurigram Agricultural Development Project | IFAD | BWDB | – | Aug’84-Dec’84 | |
20. | 100 Thana (Ex-Upazila) Intensive Rural Works Programme, Phase-II (Feasibility Study) | IFAD | LGRD | – | Jan’82-Nov’83 | |
21. | Agro-Socio-Economic Survey under Tangail Agricultural Development Project. | GTZ | BADC | – | Jun’82-Sep’82 | |
22. | Customs Union in South-East Asia | The Ford Founda-tion | The Ford Founda-tion | – | Jan’80-Jun’80 | |
23. | Agro-Socio-Economic Survey | IFAD | BADC | – | Jul’79-Jan’80 | |
24. | Extent of Rural Unemployment in Bangladesh | PC | PC | – | Feb’78-Dec’78 |
- GROUND WATER DEVELOPMENT PROJECTS
Sl. No. | Project | Client | Associate Consultant |
Project Cost (mil USD) |
Project Period | |
Funding Agency | Exec. Agency | |||||
1. | Study to Forecast Declining Groundwater level in Bangladesh | UNICEF | DPHE | Mott MacDonald Ltd. UK | Dec’93-Jun’94 | |
2. | IDA Deep Tubewells Project‑II | ODA, UK/ IDA | BADC |
Sir M. MacDonald and Partners Ltd. (U.K.) Hunting Technical Services Ltd. |
BDT 20,134.00 lacs. | Aug’83-Jun’92 |
3. | Annual Evaluation Study of IDA Deep Tubewell II Project (Phase-II) | IDA | BADC | – | May’88-Jan’90 | |
4. | Special Ground Water Studies | IDA | MPO | – | Feb’84-Dec’86 | |
5. | Annual Evaluation Study of IDA Deep Tubewell II Project (Phase-I) | IDA | BADC | – | Aug’85-Aug’86 | |
6. | Groundwater Field Survey | UNDP | BWDB/ MPO | – | BDT 880.00 lacs. | Apr’84-Mar’85 |
7. | Dhamrai Deep-Set Hand Pump Demonstration Project | UNDP | MPO | – | Apr’84-Mar’85 | |
8. | Groundwater Survey of Tanore Thana (Ex-Upazila) | UNDP | MPO | – | Mar’84-May’84 |
- EDUCATION SECTOR DEVELOPMENT PROJECTS
Sl. No. | Project | Client | Associate Consultant |
Project Cost (mil USD) |
Project Period | |
Funding Agency | Exec. Agency | |||||
1. | Introduction of Dakhil (Vocational) Courses in Selected Madrasha(s) (Phase-I) under the Assistance of IDB. | IDB | MOE | – | BDT 3,648.69 Lacs | Apr.’04-Dec’08 |
2. | Emergency Flood Rehabilitation Programme in Secondary and Higher Secondary Educational Institutions Projects. | IDA | MOE | – | Feb’06-Jun’07 | |
3. | Preparation of Design Maintenance Manual for Primary School. | PMED | Nov’00-Feb’01 | |||
4. | IDA Assisted Primary Education Development Project for Dhaka, Rajshahi and Khulna Division. | IDA | LGED | – | BDT 87,073.00 lacs. | Mar’03-Aug’03 |
5. | Construction of 137 Selected Madrasha under the Assistance of Islamic Development Bank (IDB) | IDB | FD | – | BDT 2,295.36 Lacs | Mar’01-Jun’03 |
6. | 2nd Primary Education Sector Project (Development of Primary Education in Chittaogng, Sylhet and Barisal Division) Phase-II (ADB-Loan-1521-BAN-SF). | ADB | MOE/ PIMU | – | BDT 60,775.00 lacs. | Nov’00-Feb’01 |
7. | IDB Assisted Govt. Primary School cum Flood Shelter Construction Project | IDB | LGED | – | BDT 5,438.14 Lacs. | Oct’97-Jun’00 |
8. | IDB Assisted Govt. Primary School Construction Project | IDB | LGED | – | BDT 5,434.00 Lacs. | Mar’95-Jun’97 |
9. | Second Primary Education Sector Project | ADB | ADB | – | Apr’96-May’96 | |
10. | General Education Project (2118 BD) IDA Preparation of Back-up Report for Mid-Term Review | IDA | IDA | – | Jan’93-Feb’93 | |
11. | Higher Secondary Education Sector Project (T.A. No. 1294 to GOB) | ADB | ADB | – | BDT 24,319.00 lacs. |
Feb’91-Mar’91 Jul’91-Jul’91 |
12. | Primary Education Sector Project for Chittagong Division (Project Appraisal T.A. No. 1136 to GOB) | ADB | ADB | – |
Apr’89-Nov’89 Oct’89-May’93 |
|
13. | Post Secondary Science Education Project | ADB | ADB | – | Dec’87-Jan’88 |
- WATER SUPPLY, SEWERAGE, SOLID WASTE MANAGEMENT, SANITATION AND WATER TREATMENT PLANT PROJECTS
Sl. No. | Project | Client | Associate Consultant |
Project Cost (mil USD) |
Project Period | |
Funding Agency | Exec. Agency | |||||
1. | Consultancy Services for Design and Construction Supervision for 37 District Towns Water Supply Project (Revised) | DPHE | DPHE | ORG, India | BDT 8,990 million. |
Jun’18- Mar’20 |
2. | Consultancy Services of Preparation of the Khilkhet Water Treatment Plant, TA-8053 BAN | ADB | DWASA | Mott MacDonald | – | Sep’12-Apr’13 |
3. | Investigation, Design and Construction of 5MGD (937 M3 /h) Iron Removal Plant at existing 15MGD (2812 M3 /h) Kalurghat Iron Removal Plant | CWASA | CWASA | Mott. MacDonald Ltd., UK | Nov’97-May’02 | |
4. | Construction Supervision of Intake Structure and Pumping Station (Package-1); Connecting Culvert (Package-3); Ancillary Structures of Treatment Plant (Package-5); Primary Transmission Main (Package‑6) and Design of Secondary and Tertiary Distribution System (Package‑7) under Fourth Dhaka Water Supply Project (Saidabad Water Treatment Plant) including defect liability. | WB | DWASA |
BCEOM – French Engineering Consultants (France) Mott MacDonald (U.K.), Persons Engineering Science (U.S.A.) AQUA Consultant and Associates Ltd. & Dial Consultants Ltd. (Bangladesh) |
US$ 2.94 million |
Jan’99-Jun’02 |
5. | Construction Supervision of Supply and Installation of Electro-Mechanical Equipment and Civil Works of Saidabad Water Treatment Plant (225 mlds) under DWASA-IV Project (Package 4A & 4B) including defect liability period. | France Govt. World Bank | DWASA | BCEOM, French Engineering Consultants (France) | BDT 75,043.00 lacs. | Jan’98-May ’02 |
6. | Consultancy Services for Supervision of Civil Engineering Design Leading to Tendering of Civil Engineering Works (Contract-4B) of Saidabad Water Treatment Plant under DWASA‑IV Project. | France Govt. World Bank | DWASA | BCEOM, French Engineering Consultants (France) | BDT 75,043.00 lacs. | May’96-Dec’97 |
7. | Consultancy Services for Planning, Design etc. of Ancillary Structures of Saidabad Surface Water Treatment Plant (225 mld), 38 km Pipelines of 300~1800 mm Dia under DWASA-IV Project. | France Govt. World Bank | DWASA | BCEOM, French Engineering Consultants (France) | BDT 75,043.00 lacs. | Sept ‘95-Dec’95 |
8. | Emergency Water Supply Project in Dhaka City (Feasibility Study and Detailed Engineering) including Detailed Design, Tender Evaluation and Construction Supervision (Amendment 1,2,3). | French-Bangladesh Protocol | DWASA | BCEOM, French Engineering Consultants (France) | BDT 75,043.00 lacs. | Jan’90-Jun’95 |
9. | Augmentation of Water Supply System (Bangladesh Agricultural University, Mymensingh) | BAU | BAU | – |
Jul’93- June 97 |
|
10. | Feasibility cum Project Preparation Study for Water Supply at Mongla Port, Township and EPZ | DPHE | DPHE | – | BDT 500.00 million | June 97-June 98 |
11. | Programme for Performance Improvement in Mirpur, Revenue Zone-4, Dhaka WASA. | WB | DWASA | IBCS-PRIMAX Software (Bd) ltd | Nov’’96-Dec’99 | |
12. | Water Supply and Sanitation Urgent Expansion Project, Dhaka, WASA-III. | IDA | DWASA | Mott MacDonald Ltd. (U.K.) Camp Dresser & McKee (USA), Desh Upodesh Ltd. (Bangladesh) | BDT 12,950.00 lacs. | Nov’88 -Mar’98 |
13. | Preparation of Case Study for Dhaka City Managing Water Resources to Meet Megacity Needs. | ADB | ADB | – | May’93-Jul’93 | |
14. | Dutch Aided Water Supply Project (18 District Towns, Monitoring Mission) | Dutch Embassy | DPHE | – | 1993 | |
15. | Dutch Water Supply Project (12 District Town, Formulation Mission) | Dutch Mission | – | Feb’93-Apr’93 | ||
16. | 5-District Towns Water Supply Project – ADB (Mission Study) | ADB | DPHE | – | Oct’92-Dec’92 | |
17. | Dhaka Water Supply and Sewerage Preparation of Detail Drawing and Construction Documents for Water Treatment Plant at Demra and Other Works. | IDA | DWASA | Camp Dresser and McKee (USA) Sir M. MacDonald International Ltd. (UK), DUL (Bangladesh) | BDT 497.00 lacs. | Feb’89-Feb’92 |
18. | Water Supply and Sanitation Urgent Expansion on Project Dhaka Region Ground Water and Subsidence Study (IDA Credit No. 1734-BD) | IDA | DWASA |
Sir M. Mott. MacDonald and Partners (UK), Camp Dresser and McKee (USA) DUL (Bangladesh) |
Aug’90-Jun’91 | |
19. | Sewerage and Storm Water Drainage Improvement at Bangladesh Tobacco Company (BTC) Factory Complex, Dhaka | BTC | BTC | Mott MacDonald International Ltd.(UK) | Mar’90-Jun’90 |
3.5 Overseas Projects
Sl. No. | Project | Client | Associate Consultant |
Project Cost (mil USD) |
Project Period | |
Funding Agency | Exec. Agency | |||||
1. | Consultancy Services for Accurate Engineering Surveying, Designing, Supervision and Monitoring under the Project “Construction of Social Infrastructure Facilities for IDPs in Azerbaijan. | IDB | SFDI, Azer-baijan | BETS (BD), Yeni Memar (Azerbaijan) | Jan’07-Dec’09 | |
2. | Second Pump Irrigation and Area Development Project, Burma. | ADB | – | – | 1989 | |
3. | Second UP Public Tubewell Project, India. | IFAD | – | – | 1986 | |
4. | Malakand Area Development Project, Pakistan. | IFAD | – | – | 1985 | |
5. | Rajsthan Command Area Development Project, India. | IFAD | – | – | 1983 | |
6. | Babai Irrigation Project, Nepal. | WB | – | Sir M.MacDonald and Partners, U.K. | 1981-1982 |